Similar Projects
Huron Road Resurfacing and Widening
Post-Bid
Frisco, CO 80443

High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

Coyne Valley Road Improvements
Results
Less than $3,101,255 est. value
Breckenridge, CO

Earth Work & Paving
Results
Frisco, CO 80443

Statewide Asphalt
Post-Bid

CO CRVFO Roads & Construction IDR 2020
Results
$25,000 to $150,000 est. value

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

CO LSFO Roads & Construction IDR 2020
Results
$25,000 to $40,000 est. value

2020 Boreas Pass Road Reconstruction
Post-Bid
Frisco, CO 80443

CO KFO Roads & Construction IDR 2020
Results
$25,000 to $170,000 est. value

Hamilton Creek Road Resurfacing Project
Post-Bid
Dillon, CO 80435

2020 Paving Improvements
Results
Less than $300,000 est. value
Silverthorne, CO

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

I-70 EJMT Tunnels
Results
$1,000,000 to $5,000,000 est. value

High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

Last Updated 05/27/2021 12:48 PM
Project Title

2021 Boreas Pass and Baldy Road Reconstruction

Physical Address View project details and contacts
City, State (County) CO   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following work: • Full depth reclamation of roadway to include pulverizing existing asphalt and mixing with subgrade material to a depth of six and seven-inches, re-grading and preparing for asphalt pavement surfacing. • Provide, place and compact approximately 6,500 LF of asphalt pavement surfacing to a depth of 5-inches. • Remove and Replace approximately 2,500 lineal feet of Guardrail w 10 end sections. • Remove and Replace multiple 18 and 24 inch diameter corrugated metal culvert pipe. • Perform all work in accordance with the plans and specifications provided. Bid Opening Information for SCP21-02 Boreas Pass and Baldy Road Reconstruction Time: May 20, 2021 10:00 AM Mountain Time (US and Canada) Join Zoom Meeting https://us02web.zoom.us/j/88673574644?pwd=SUg3NG82SVFUeXFoa1VLcWxRNDhpUT09 One tap mobile +13462487799,,88673574644#,,,,*8890699555# US (Houston) +16699009128,,88673574644#,,,,*8890699555# US (San Jose) Dial by your location +1 346 248 7799 US (Houston) +1 669 900 9128 US (San Jose) +1 253 215 8782 US (Tacoma) +1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York) +1 301 715 8592 US (Washington DC) Meeting ID: 886 7357 4644 Passcode: 8890699555 Find your local number: https://us02web.zoom.us/u/kcHisisZMP

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents