Similar Projects
Hallmark Property Development - Warrior
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Warrior, AL 35180

Woodford Pump Station Replacement - City of Hoover
Renovation
Conception
$515,000 CJ est. value
Hoover, AL 35226

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

Southern Research Biotech Building
Demolition, New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Birmingham, AL 35203

Village Creek Water Reclamation Facility Reliability and Biological Improvements - Phase 3
Renovation, Infrastructure
Bidding
$45,000,000 CJ est. value
Birmingham, AL 35224

STAYAPT Suites /Bessemer
New Construction, Infrastructure - 39,601 SF
Bidding
$6,000,000 CJ est. value
Bessemer, AL 35022

2020 PS03 Pump Station Upgrades
Renovation, Infrastructure
Post-Bid
$3,500,000 est. value
Birmingham, Brighton, AL 35203

City Of Lincoln Water And Sewer For Scalf/Alf
New Construction
Post-Bid
Homewood, AL

Ruffner Park Revitalization Phase I
Infrastructure
Results
Irondale, AL 35210

2019 Pump Station Upgrades No 1 Jefferson Metropolitan, Mcadory, and Coleman Lakes
New Construction
Results
$2,764,350 est. value
Birmingham, AL

Alamo Drafthouse Cinema
New Construction, Infrastructure - 50,000 SF
Construction
$10,000,000 CJ est. value
Birmingham, AL 35233

CenterState Logistics Park One
New Construction, Infrastructure - 1,000,000 SF
Construction
$24,300,000 CJ est. value
Birmingham, AL 35207

Samford University Recreation Center and Athletic Complex
New Construction, Infrastructure - 154,000 SF
Pending Verification
$30,000,000 CJ est. value
Birmingham, AL 35229

Douglas Commons
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Hoover, AL 35226

1707 Reese Street Mixed Use
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Homewood, AL 35209

Last Updated 11/17/2022 05:09 PM
Project Title

Well 16 - Installation and Well Development

Physical Address View project details and contacts
City, State (County) Trussville, AL 35173   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all labor, equipment and doing the work of constructing, according to Plans, Specifications and Contract Documents on file in the office of Trussville Gas and Water, the project hereinafter described. Additional information will be made available by calling (205) 655-3211. 1. Furnish & Install 22", 18", and 14" outside diameter with 0.3750" wall thickness steel casing by dual rotary or casing advancement 2. Furnish labor, equipment, and materials to install well casing & stainless steel screen as shown on the drawing and as required by specifications 3. Furnish & Install test pump, starter, piping, water flow measuring equipment and electrical Trussville Gas and Water reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. No bid may be withdrawn after the time for opening bids has passed. Trussville Gas and Water reserves the right to hold the bids for a period of Sixty (60) days after the date of receiving Bids. If said bid equals $20,000.00 or more, a certified check or bid bond must accompany each bid in an amount of not less than five percent (5%) of the total bid, but in no event more than $10,000.00. The payee of such check, or the obligee of such bond, shall be Trussville Gas and Water. Contractor agrees to comply with all specifications, plans and contract documents as furnished by Trussville Gas and Water. Contractor must be licensed under the provisions of Title 34 Chapter 8, Code of Alabama, 1975. Prior to submitting a bid for this project, contractor must be prequalified as a Well Utility Contractor for Trussville Gas and Water. Contractor prequalification applications may be obtained at Trussville Gas and Water Engineering Dept., 6620 Green Drive, Trussville, Alabama 35173.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents