Similar Projects
Harold Hall Quarry Beach Parking Lot Improvements
Bidding
Batavia, IL 60510

2021 Water & Sewer Division Emergency Repair
Term Contract
Post-Bid
Aurora, IL 60505

2021 Fire Hydrant Sandblasting and Painting Project
Post-Bid
Carpentersville, IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Route 31 Water Main Relocation - Phase 2
Results
$1,000,000 to $2,000,000 est. value
South Elgin, IL 60177

Hughes Creek Golf Course Parking Lot Removal and Replacement
Post-Bid
Elburn, IL 60119

Rotary Plaza Pedestrian Bridge Removal and Walkway Reconstruction
Results
Aurora, IL 60505

LeRoy Oakes and Burnidge Forest Preserve Parking Lot and Roadway
Post-Bid
Geneva, IL

2020 MFT Sidewalk Repair Program
Results
Less than $24,876 est. value
Carpentersville, IL 60110

Mill Creek Special Service Area ADA Sidewalk Replacement Phase I
Post-Bid
Geneva, IL 60134

2020 Alley and Parking Lots Maintenance
Results
Elgin, IL 60120

Illinois Route 25 Force Main Relocation
Results
South Elgin, IL 60177

2020 Street Program Wellington Laurel
Renovation
Results
Elgin, IL 60120

Pavement Improvements
Renovation
Results
Sugar Grove, IL 60554

Backflow Testing And Repairs
Results
Elgin, IL 60120

Last Updated 04/02/2021 08:45 AM
Project Title

2021 Street and Watermain Improvements

Physical Address View project details and contacts
City, State (County) Geneva, IL   (Kane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work include improvements on fourteen (14) different City streets, for a combined length of a little more than two (2) miles. The pavement on Andover Lane, Normandy Lane and Greenwich Lane will be reconstructed. There will also be spot removal and replacement of the curb and sidewalk, watermain replacement and one (1") water services will be placed between the new main up to the Curb Stops. The 10 inch watermain located in the gravel alley north from Seventh Street will be extended north to Peyton Street and connected into the existing watermain. All the other streets listed will be resurfaced along with curb and sidewalk maintenance. Sidewalk repairs shall be the removal of Trip hazard as described herein. The parkway will be restored with topsoil, seed and mulch after the concrete work is complete and before paving starts. Pavement marking shall be done on various city streets.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents