Similar Projects
Traffic Signal at 12th Avenue and Hume Avenue - City of Hanford
New Construction, Renovation
Conception
$1,854,590 CJ est. value
Hanford, CA 93230

Soil Cement Sludge Bed Renovation Project - City of Hanford
Infrastructure
Conception
$303,730 CJ est. value
Hanford, CA 93230

Replace Bridge
Demolition, New Construction, Infrastructure
Design
$18,500,000 CJ est. value
Stratford, CA 93266

Replace Bridge
Demolition, New Construction, Infrastructure
Design
$18,500,000 CJ est. value
Stratford, CA 93266

Remove and Replace Culverts and Cured in Place Pipeliner
Infrastructure
Bidding
$8,100,000 CJ est. value
Shaver Lake, CA 93664

Remove and Replace Culverts and Cured in Place Pipeliner
Infrastructure
Bidding
$8,100,000 CJ est. value
Shaver Lake, CA 93664

Fy 21/22 Senate Bill (Sb) - 1 Funded Kings County Roadway Improvement Testing Services Project
Term Contract
Post-Bid
Hanford, CA

Fy 21/22 Senate Bill (sb) - 1 Funded Kings County Roadway Improvement Surveying Project
Infrastructure
Post-Bid
Hanford, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

O'Reilly Auto Parts (AVL) #6021 / Avenal
New Construction, Infrastructure - 7,453 SF
Construction
$1,300,000 CJ est. value
Avenal, CA 93204

O'Reilly Auto Parts (AVL) #6021 / Avenal
New Construction, Infrastructure - 7,453 SF
Construction
$1,300,000 CJ est. value
Avenal, CA 93204

Central Valley Meat Plant Expansion
Addition, New Construction, Infrastructure - 390,460 SF
Pending Verification
$75,500,000 CJ est. value
Hanford, CA 93230

Central Valley Meat Plant Expansion
Addition, New Construction, Infrastructure - 390,460 SF
Pending Verification
$75,500,000 CJ est. value
Hanford, CA 93230

Centennial Park Lighting Project - City of Hanford
Infrastructure
Conception
$378,200 CJ est. value
Hanford, CA 93230

Last Updated 12/28/2023 09:31 PM
Project Title

East Lacey Boulevard Widening/Reconstruction 10th Avenue Sierra Drive

Physical Address View project details and contacts
City, State (County) Hanford, CA 93230   (Kings County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $3,593,850 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is included City of Hanford's fiscal years 2024-2029 Capital Improvement Plan (CIP). As of December 28, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is allotted to fiscal year 2025. A detailed scope has not yet been released. This project will involve the widening and reconstruction of East Lacey Boulevard, between 10th Avenue and Sierra Drive, to facilitate two lanes in each direction of travel plus turn lanes. Improvements will include the reconstruction of existing pavement section, installation of a new drainage collection/disposal system, installation of curbs, gutters, sidewalks, drive approaches and ADA ramps, installation of a traffic signal system at East Lacey Boulevard / Ninth Avenue and installation of additional street lighting. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents