Similar Projects
Excavation Work for Gateway Preparatory Academy
Infrastructure
Design
$130,000 CJ est. value
Enoch, UT 84721

Brian Head Town Trail Phase 3 Project
Infrastructure
Design
$80,000 CJ est. value
Brian Head, UT 84719

Request for Proposals (RFP) for Construction Management / General Contractor Services New Music Center Building
Addition, Demolition, Renovation, Infrastructure - 39,300 SF
Bidding
$29,500,000 CJ est. value
Cedar City, UT 84720

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Snowshoe and Toboggan Waterline Project
Infrastructure
Post-Bid
Brian Head, UT

SR-289; SUU Loop
Infrastructure
Results
$500,000 to $1,500,000 est. value
UT

I-15; South Cedar To North Cedar
Infrastructure
Results
$500,000 to $1,500,000 est. value
UT

Toboggan Lane and Snowman Drive Waterline Project
Infrastructure
Design
Brian Head, UT 84719

Forest and Falcon Waterline Project
Infrastructure
Post-Bid
Brian Head, UT

DFCM Construction-Standard Low Bid-Old Iron Towns Site
Infrastructure
Results
$160,000 est. value
Cedar City, UT 84720

Canyon Sewer Line Capacity Project
Infrastructure
Design
$500,000 CJ est. value
Brian Head, UT 84719

Paved Town Trail Phase III
Infrastructure
Post-Bid
Brian Head, UT

DFCM Construction-Pre-Qualified Paving and Site/Civil-SUU Auditorium Parking Lot Improvements
Infrastructure
Results
$84,000 est. value
Cedar City, UT 84720

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Schedule I - Pavement Maintenance
Infrastructure
Results
$500,000 est. value
Cedar City, UT 84721

Last Updated 05/04/2023 06:34 PM
Project Title

Southwest Technical College A&T Building Sidewalk, Paving and Waterway

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84720   (Iron County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected November 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $196,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Acknowledgement of Dfcm General Conditions and Other Policies is Now Required to View This Event* Completion Date: August 4, 2023 Due to This Requirement, Contractors Wishing to View the Bidding Documents Must Create an Account and Sign in to the Utah Public Procurement Place Website. The bid documents will be available at 3:00 PM on Wednesday, April 12, 2023 on the DFCM website . Construction Cost Estimate: $196,000.00 Project Description/Base Bid: More parking is needed at the facility as well as improved drainage. Mobilization. 3 inch hma pg 58-28 (1/2" mix). Sawcutting. Remove asphalt. Excavation. Untreated base course. Granular borrow. 24 inch curb and gutter. 30 inch curb and gutter. 4-inch concrete flatwork. Driveway. Remove concrete. Irrigation. Landscaping. Pavement marking paint. Question Deadline 04/21/2023 at 3:00 PM MT Information / Clarification shall be submitted in writing by Email. Technical Questions - sciquestadmin@utah.gov.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents