Similar Projects
Water Main Improvements
Infrastructure
Post-Bid

Dead-End Hydrant Flushing
Infrastructure
Post-Bid
East Moline, IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2021 Water Service and Sanitary Lateral Repair Programs
Term Contract
Results
Less than $207,071 est. value
Rock Island, IL

Engineering Services for 30th Street Resurfacing
Infrastructure
Post-Bid
Rock Island, IL 61201

Avenue of the CIties and 18th Street B Utilities
Results
Moline, IL 61265

US Route 6 Water Main Crossing
Infrastructure
Post-Bid
$400,000 est. value
Coal Valley, IL 61240

35th Street Water Main, 6th Avenue to 7th Avenue
Results
Less than $106,455 est. value
Rock Island, IL 61201

Housing Rehabilitation Program 6-2021 EDPL - Water and Sewer Lines
Renovation
Results
Rock Island, IL 61201

2021 Water Main Lining
Results
Moline, IL

Housing Rehabilitation Program - Water Service (Lopez)
Results
Rock Island, IL 61201

2021 Lead Water Service Replacements
Results
Moline, Rock Island, IL 61266

Vortisand Water Filtration System Update
Results
Rock Island, IL 61299

Rapids City Water Main Extension
Infrastructure
Results
$306,643 est. value
Rapids City, IL

1st Street Court and 2nd Street Court Utility and Roadway Improvements
Alteration
Results
East Moline, IL

Last Updated 04/28/2022 12:44 PM
Project Title

Building 0009 Repair Deep Water Intake Pipe

Physical Address View project details and contacts
City, State (County) Rock Island, IL   (Rock Island County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Summary - The Rock Island Arsenal is soliciting a project to construct a new deep water intake pipe and removal of the existing, damaged deep intake from the river. Work also includes pipe inspection, and installing new valve and piping on the suction side of the Building 009 raw water pumps. Demolish various concrete structures, piping, and damaged items. Demolition requires staging to allow continued operation of the water treatment plant. Site wet work: Construction intake pipe, connect pipe through levee, remove damage intake pipe and fill abandon pipe section. Site work near river: Repair levee, establish ground cover and place rip-rap; remove valve from abandoned pipe. Site work on land side of levee: Construct expanded valve pit, connect constructed intake pipe, make changes to the piping in valve pit, construct retaining wall, and install steps and handrail, and grade site to slope. Contractors and sub-contractors shall be licensed in Illinois according to the work they are performing. If applicable to a trade or profession, workers shall be licensed as required by local municipality or by the State of Illinois. The contractor shall be required to commence work under this contract within 15 calendar days after the date the Contractor receives the Notice to Proceed, prosecute the work diligently, and complete the entire construction and all close out contract work not later than 300 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents