Project Title | Lift Station 23 Upgrades and Force Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Savannah, GA (Chatham County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be done consists of the following generally described items: • Approximately 6,200 LF of 30” FPVC sanitary forcemain carrier pipe and 36” steel casing installed by horizontal directional drilling under historic downtown. • Approximately 300 LF of 30” FPVC sanitary forcemain carrier pipe and 36” steel casing installed by micro-tunneling under the Springfield drainage canal. • Approximately 400 LF of 30” DIP interconnecting sanitary forcemain pipe installed by direct bury. • Two (2) new submersible mixer/chopper pumps and motor control center. • Demolition and replacement of existing electrical service, generator, and automatic transfer switch. • Miscellaneous equipment, materials, services, and site work necessary to complete the project as described in the contract documents. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |