Similar Projects
Savannah Quarters Lift Station and Force Main
New Construction, Infrastructure
Bidding
Pooler, GA

Savannah Quarters Lift Station and Force Main
New Construction, Infrastructure
Bidding
Pooler, GA

Bloomingdale Regional Utilities
New Construction
Post-Bid
Savannah, GA

Rockingham Farms Water and Sewer Extension
Infrastructure
Post-Bid
Savannah, GA

Prosperity Drive Water and Sewer Improvements
Results
Garden City, GA 31418

Landfill Leachate Pump and Hauling Services
Term Contract
Results
Savannah, GA 31401

Lighthouse Area Sewer Phase II
Infrastructure
Bidding
Tybee Island, GA

Prosperity Drive, Water And Sanitary Extensions
Infrastructure, Alteration
Post-Bid
Garden City, Savannah, GA 31405

Bonnybridge Road Secondary Outfall Improvements
Results
Port Wentworth, GA 31407

Protective Coatings
Infrastructure
Post-Bid
Savannah, GA

Sewer Line Construction
Results
Tybee Island, GA

Lighthouse Area Sewer Project
Results
Tybee Island, GA

Sallie Mood Drive and Agonic Road Force Main Replacement Project Phase I
Results
Savannah, GA 31406

Hodgeville Booster Pump Station
New Construction
Results
GA

Central Avenue Lift Station Rehabilitation Project
Renovation
Results
Savannah, GA 31406

Last Updated 10/27/2021 02:13 AM
Project Title

Lift Station 23 Upgrades and Force Main Replacement

Physical Address View project details and contacts
City, State (County) Savannah, GA   (Chatham County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of the following generally described items: • Approximately 6,200 LF of 30” FPVC sanitary forcemain carrier pipe and 36” steel casing installed by horizontal directional drilling under historic downtown. • Approximately 300 LF of 30” FPVC sanitary forcemain carrier pipe and 36” steel casing installed by micro-tunneling under the Springfield drainage canal. • Approximately 400 LF of 30” DIP interconnecting sanitary forcemain pipe installed by direct bury. • Two (2) new submersible mixer/chopper pumps and motor control center. • Demolition and replacement of existing electrical service, generator, and automatic transfer switch. • Miscellaneous equipment, materials, services, and site work necessary to complete the project as described in the contract documents.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents