Similar Projects
Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

Construction of Lift Station 1 Relocation
New Construction
Bidding
Maitland, FL

City of Cocoa Chemical Conversion and Reliability Improvements
Post-Bid
Christmas, FL 32709

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Park Masterlift Station Replacement
Results
Eatonville, FL 32751

Lift Station No. 45 Replacement
Results
Less than $6,500,000 est. value
Orlando, FL 32802

Utilities Pump Station Improvements Package 24
Bidding
$2,160,127 est. value
Belle Isle, Orlando, FL 32812

Orange County Utilities Pump Station Package 40
Post-Bid
$2,068,770 est. value
FL

Lift Station #17 Rehabilitation
Results
Less than $350,000 est. value
Maitland, FL 32751

Design-Build Services for Water Conserv I WRF Rehabilitation and Expansion
Post-Bid
Orlando, FL 32800

Package 11 Pump Station Improvements
Results
Less than $1,627,290 est. value
Orlando, FL 32818

Moss Park Lift Station and Electrical Upgrades
Post-Bid
$1,400,000 est. value
Orlando, FL 32832

Orange County Pump Station Package 16 Improvements
Results
Less than $2,182,304 est. value
Orlando, FL 32801

Lift Station 218 Relocation
Results
Less than $1,900,000 est. value
Orlando, FL 32802

Pump Station Package 23 Improvements
Results
Less than $2,116,000 est. value
Orlando, FL 32801

Last Updated 08/05/2020 01:19 PM
Project Title

Packing District Park - Master Lift Station Upgrades

Physical Address View project details and contacts
City, State (County) Orlando, FL 32869   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method
Project Status Construction Commenced August 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Environmental Assessment, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Reinforcing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Hardware.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 22 - Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 32 - Exterior Improvements, Flexible Paving, Fences and Gates, Irrigation, Turf and Grasses.
Division 33 - Utilities.
Division 40 - Process Integration.
Division 41 - Material Processing and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents