Similar Projects
Taylor Highway MP 54 Culvert Replacement
Infrastructure
Bidding
$500,000 to $1,000,000 est. value

Taylor Highway MP 54 Culvert Replacement
Infrastructure
Bidding
$500,000 to $1,000,000 est. value

Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

Coastal Erosion Protection
Term Contract
Post-Bid
Barrow, AK

2021 Kenai Municipal Airport Airfield Drainage
Infrastructure
Results
Kenai, AK

2021 Bryson Avenue Bluff Erosion Repair
Infrastructure
Results
Kenai, AK 99611

Campbell Woods Subdivision Area Road and Drainage Improvements Phase IV
Infrastructure
Bidding
$3,000,001 to $5,000,000 est. value
Anchorage, AK

Harbor Breakwater Navigation Improvements
Term Contract
Post-Bid
Craig, AK

Point MacKenzie Rail Extension Bridge Repairs
Renovation, Alteration
Results
Matanuska, AK

Willer - Kash Road Access Improvements
Infrastructure
Bidding
$10,000 to $50,000 est. value
Willow, AK 99688

Ninilchik Revetment Replacement
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Ninilchik, AK

Earthquake Repairs - Phase I & II
Infrastructure
Results
$1,500,000 est. value
Whittier, AK

Salmon Creek Channel Excavation and Embankment Maintenance
Infrastructure
Bidding
Seward, AK 99664

Polychrome Area Improvements
Alteration
Post-Bid
$35,000,000 to $45,000,000 est. value

Design-Build Services for Knutson Drive Critical Repairs
Infrastructure
Results
$800,000 est. value
Sitka, AK 99835

Last Updated 03/30/2022 06:13 AM
Project Title

Hazmat Hazardous Waste Gate Replacement

Physical Address View project details and contacts
City, State (County) AK   (Matanuska-Susitna County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Remove existing operator and gate. B. Pour new pad with NSF fill for the slide gate operator. C. Properly size and install new slide gate and required appurtenances. D. Install operator. E. Make all electrical connections. E. Adjust system so that slide gate operators work smoothly. G. Provide twelve (12) remote control operators for gate.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents