Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Lockwood Folly Park Facilities - Brunswick County
Infrastructure
Conception
$3,800,000 CJ est. value
Bolivia, NC 28422

Ash - Waccamaw Multiuse Building
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Ash, NC 28420

Bolivia Elementary School Stacking Lane
Infrastructure
Design
$80,000 CJ est. value
Bolivia, NC 28422

Shallotte Rest Area Renovation - Readvertisement
Infrastructure
Bidding
$3,000,000 CJ est. value
Bolivia, NC 28422

Shallotte Rest Area Renovation - Readvertisement
Infrastructure
Bidding
$3,000,000 CJ est. value
Bolivia, NC 28422

Pavement Resurfacing on Various Roadways
Post-Bid
Sunset Beach, NC

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

2021 Street Resurfacing
Results
Sunset Beach, NC

Brunswick Resurfacing A
Results
NC

Bolivia By-Pass Transmission Force Main - Brunswick County
Infrastructure
Conception
$13,715,000 est. value
Bolivia, NC

Brunswick Bridge 104 Replacement
Demolition, New Construction, Infrastructure
Design
$4,403,700 CJ est. value
Bolivia, NC 28422

Heartease / Calabash
New Construction, Infrastructure - 292,152 SF
Bidding
$85,000,000 CJ est. value
Calabash, NC 28467

Olde Waterford Way Roadway Extension
Infrastructure
Post-Bid
Leland, NC

Brunswick Resurfacing B/ Ocean Isle Bch Bike Lanes
Results
NC

Last Updated 08/18/2022 06:02 AM
Project Title

Drayton Road Improvements

Physical Address View project details and contacts
City, State (County) Boiling Spring Lakes, NC 28461   (Brunswick County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $586,283 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 27, 2022. The Project will be awarded at the August 2, 2022 Board of Commissioners meeting.** The City of Boiling Spring Lakes proposes roadway improvements to Drayton Road. The work generally includes but is not limited to removal of the existing stone road and rebuilding the road with a coarse aggregate subbase, asphalt pavement surface and stone shoulders.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents