Similar Projects
Cooling Tower and Boiler Replacement
Bidding
Las Vegas, NV 89121

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

Fume Hood
Post-Bid
Las Vegas, NV

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

UNLV CBC-C 1st and 2nd Floor Repipe
Results
$820,000 est. value
Las Vegas, NV 89154

Satellite Energy Plant (SEP) Cooling Tower Repair
Post-Bid
$225,000 est. value
Las Vegas, NV

Big Bend Water Treatment Plant Ozone Generator Room HVAC Upgrade
Results
$185,000 est. value
Las Vegas, NV

45--Supply and Replace HVAC Units
Post-Bid
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

Replace HVAC Components and Roof - Elizabeth Wilhelm Elementary
Post-Bid
$2,250,000 est. value
North Las Vegas, NV 89031

Replace HVAC Components and Roof - Dean La Mar Allen Elementary School
Post-Bid
$1,830,000 est. value
Las Vegas, NV 89121

Cooling Tower Maintenance and Repair Services
Post-Bid
North Las Vegas, NV 89121

Cooling Tower Rebuild Multiple High Schools
Post-Bid
$100,000 est. value
Las Vegas, NV

Replace HVAC Controls and Roof Fredric W Watson Elementary School
Post-Bid
$310,000 est. value
North Las Vegas, NV 89031

Last Updated 05/27/2021 11:02 AM
Project Title

West Charleston Building C - 2nd Floor HVAC Replacement Phase A

Physical Address View project details and contacts
City, State (County) Las Vegas, North Las Vegas, NV 89146   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $319,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing Fan Coil Units and Associated Ducts that cannot be re-used in place. This includes all electrical and mechanical work. Install new trunk lines to existing AHU and install new VAVs and ductwork per plans. Route electrical and mechanical hydronic lines to new VAVs.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents