Similar Projects
FM 1382 Sidepath MCIP 40227 Contract
Infrastructure
Bidding
$1,887,265 est. value
Dallas, TX 75200

Plano Parkway/Warmington Drive Park and Parking Lot Design Project
Infrastructure
Bidding
$1,675,000 est. value
Carrollton, TX 75008

Heritage Community Park and Police Department Parking Lot Improvements
Post-Bid
Glenn Heights, TX 75154

2020 Sidewalk and Barrier Free Ramp Improvements at Various Locations Contract
Post-Bid
Dallas, TX 75201

MacArthur Boulevard Trail Construction
Results
$1,300,000 est. value
Coppell, TX 75019

2015 Residential Sidewalk Replacement Program Region 4
Results
$873,921 est. value
Richardson, TX 75080

Walmart Supercenter #3224-256 - Ogp-Ce
Renovation - 850 SF
Construction
Less than $7,161 est. value
Garland, TX 75043

CRWS Maintenance Parking Improvements
Post-Bid
Dallas, TX 75212

Traffic Signal and Sidewalk Installation
Results
Less than $1,661,892 est. value
TX

Streetscape and Sidewalk Repair
Post-Bid
TX 75200

Wagging Tail Dog Park - Parking Improvements
Results
$256,793 est. value
Dallas, TX 75248

White Rock Lake Trail - Bath House to Winfrey Point
Infrastructure
Post-Bid
Dallas, TX

Garland Pedestrian Path
Results
$1,385,000 est. value
Garland, TX 75042

Parking Lot Repair
Infrastructure
Post-Bid
Dallas, TX 75224

MGR Bikeway
Results
$2,100,000 to $2,400,000 est. value
Garland, TX 75040

Reported 07/10/2021 12:00 AM
Project Title

Reclamation and Resurfacing of Parking Lots at Irwin Park and Guy Berry Park

Physical Address View project details and contacts
City, State (County) Balch Springs, TX 75180   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Reclamation of asphalt pavement with cement stabilization. Pulverize to a depth of 9”; remove and dispose of 3” of material; mix in cement stabilizer at a rate of 42 lbs./sy.; hydrate and compact. Contractor is responsible for all aspects of disposal of material. Contractor’s submittal must include re-grading of areas with poor drainage. On the stabilized subbase described above, import and install should be based on Type-D HMAC surface at a depth of 3”.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents