Similar Projects
Landscape and Hardscape Improvements for Union Park Phase 6C
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Little Elm, TX 75068

Landscape and Hardscape Improvements for Union Park Phase 6C
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Little Elm, TX 75068

Installation of Plants and Related Materials
Alteration
Post-Bid
Prosper, TX 75078

Lewisville IH35 Green Ribbon Program Project
Alteration
Post-Bid
$880,552 est. value
Lewisville, TX 75077

Harvest Phase 12 Landscaping and Irrigation
Alteration
Results
TX

FWWCIDDC Landscape Maintenance
Term Contract
Results
TX

Tree and Underbrush Clearing for Engineering Department
Term Contract
Post-Bid
Corinth, TX 76208

FM 1171 - Landscape Development
Infrastructure
Results
$326,748 est. value
TX

FM 156 Green Ribbon - New Planting and Irrigation
Term Contract
Post-Bid
$959,000 est. value
Justin, TX

IH0035 - Tree Trimming and Brush Removal
Infrastructure
Results
$216,654 est. value
TX

FM 423 Green Ribbon Landscaping
Term Contract
Post-Bid
Little Elm, TX

FM 428 - Landscape Development
Infrastructure
Results
$278,208 est. value
TX

Annual Contract for Mowing/Chemical Treatment Services for Corinth Community Park
Term Contract
Post-Bid
Corinth, TX

IH0035W - Mowing Highway Right of Way
Infrastructure
Results
$296,443 est. value
TX

PARD Mowing Services
Alteration
Post-Bid
Denton, TX

Last Updated 09/29/2022 09:35 AM
Project Title

Landscape and Hardscape Improvements to Serve Harvest Meadows Phase 5 Detention Trails

Physical Address View project details and contacts
City, State (County) Denton, TX 76201   (Denton County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping, Landscaping/Irrigation
Contracting Method Competitive Bids
Project Status Construction start expected October 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This bid has been cancelled. It will not re-bid. For Harvest Meadows Phase 5 - Detention Trails Landscape and Hardscape The project is located in the ETJ of the Town of Northlake, Texas, along the South side of Old Justin Road and West of Cleveland-Gibbs Road. The site may be reached from Interstate Highway 35W by traveling north to the FM-407 exit. Exit FM-407 and turn left, heading west. Continue heading west for approximately 0.3 miles and turn right onto Cleveland-Gibbs, heading north. This projectscope is +-610,000 square feet (14 acres) of Landscape, +-10,000 square feet of concrete flatwork, and Irrigation scope for the landscaped areas. First Mobilization for this project is October 2022. Wildflower mix to be installed in May 2023 and again in September 2023. Add remobilization dates as needed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents