Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Job Order Contracting for Energy Conservation and Efficiency
Term Contract
Bidding
Austin, TX

WTP Expansion Electrical Distribution Equipment Pre-Purchase
Alteration
Bidding
Pflugerville, TX 78660

CP2 GSH: Elect/Telecom Ductbank Extension
Post-Bid
$450,000 to $500,000 est. value
Austin, TX 78713

Led 250W
Post-Bid
Austin, TX 78767

Law Enforcement (LE) Modular Office Building Utilites
Results
$225,000 to $275,000 est. value
Austin, TX 78744

Photovoltaic Power Systems and Components
Term Contract
Results
Austin, TX 78759

Rosedale School BP2 - Steel, Concrete, Electric, Elevators
- 75,000 SF
Construction
Austin, TX 78757

Generators Preventative Maintenance and Servicing
Alteration
Bidding
TX

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

J059--AITC Electrical Maintenance Services
Results
Austin, TX 78741

Electrical Repair and Maintenance Services
Alteration
Bidding
Austin, Bryan, Burnet, Cedar Park, Fredericksburg, Georgetown, Lincoln, Llano, Lockhart, Mason, San Marcos, Taylor, TX 77808

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Okonite Shielded Power Cable
Results
Austin, TX 78701

Street Light Control System
Alteration
Bidding
Cedar Park, TX

Last Updated 04/06/2022 11:43 AM
Project Title

Camp Mabry Ercip Microgrid - Milcon

Physical Address View project details and contacts
City, State (County) Austin, TX 78703   (Travis County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,228,968
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to providing a Microgrid system capable of islanding the segment of Camp Mabry’s electrical distribution system starting at the motor-operated switch (Point of common coupling with Austin Energy) and extending northward to the normally open gang switch. The system will incorporate a new 500kW ground-mounted photovoltaic (PV) solar array and a new 500kW Natural Gas Generator to two existing diesel generators; one is a 1250kW, and the other is a 300kW. The microgrid system must include a fiber master microgrid control loop, synchronization controllers, and generator controllers within Camp Mabry. This project will include a microgrid controller that must comply with Unified Facilities Criteria and, when complete, achieve an authority to operate (ATO) through the process of Risk Management Framework (RMF). This military construction project must meet the requirements of the Buy American act. Installers of Photovoltaic Systems must be registered as a participating contractor with Austin Energy to qualify.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents