Project Title | Camp Mabry Ercip Microgrid - Milcon |
Physical Address | View project details and contacts |
City, State (County) | Austin, TX 78703 (Travis County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,228,968 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes but is not limited to providing a Microgrid system capable of islanding the segment of Camp Mabry’s electrical distribution system starting at the motor-operated switch (Point of common coupling with Austin Energy) and extending northward to the normally open gang switch. The system will incorporate a new 500kW ground-mounted photovoltaic (PV) solar array and a new 500kW Natural Gas Generator to two existing diesel generators; one is a 1250kW, and the other is a 300kW. The microgrid system must include a fiber master microgrid control loop, synchronization controllers, and generator controllers within Camp Mabry. This project will include a microgrid controller that must comply with Unified Facilities Criteria and, when complete, achieve an authority to operate (ATO) through the process of Risk Management Framework (RMF). This military construction project must meet the requirements of the Buy American act. Installers of Photovoltaic Systems must be registered as a participating contractor with Austin Energy to qualify. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |