Similar Projects
Turbine Service Pump Repair and Well Maintenance Program
Term Contract, Infrastructure
Bidding
$299,100 est. value
Canton, OH

Submersible Vertical Well Pump
Post-Bid
Dayton, OH

Panel Assemblies for KI Miami North Wells
Post-Bid
Dayton, OH

Cleaning and Redevelopment of Wells #3 and #8
Results
Less than $68,956 est. value
Xenia, OH 45385

Greenfield Levee Pump/Motor #2 Repair
Results
Bainbridge, Greenfield, OH 45612

Dpu/Iqa/Project Dry Basement
Post-Bid
Columbus, OH

PUB Water Treatment Plant Well Rehabilitation Project
Results
$597,200 est. value
Batavia, OH 45103

Rough Vacuum Pumps for VF-6 and Building 301
Term Contract
Post-Bid
Cleveland, OH 44135

Vertiflo 720 Duplex Pump and Control System
Results
Less than $89,192 est. value
Dayton, OH

Influent Screw Pump Installation
Infrastructure
Post-Bid
Chillicothe, OH

PUB Well Field Control Tower (Wells 17-20)
Results
Less than $380,911 est. value
Batavia, OH 45103

Bear Exhibit Redevelopment - Pump Station Installation
Infrastructure
Post-Bid
Toledo, OH 43609

2020 GCCS Construction - Fall 2020 Wellfield Improvements
Results
$535,000 est. value
Painesville, OH 44077

Chilled Water Plant 3 Distribution Pump 2021
Infrastructure
Post-Bid
$280,000 est. value
Athens, OH 45701

DPU/Engineering - Milwaukee M18 Transfer Pump
Results
Columbus, OH

Last Updated 01/18/2022 09:00 AM
Project Title

Paul Brown Stadium City Water Booster Pump Replacement

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45202   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents