Similar Projects
Y--Slick Rock Culverts
Design
$200,000 to $400,000 est. value
Safford, AZ

Route N9702-Sawmill/Whiteclay
Post-Bid
Sawmill, AZ

Annual Culvert Pipe
Term Contract
Post-Bid
Safford, AZ 85546

San Tan West Area Drainage Master Plan-On Call
Results
$800,000 est. value
AZ

F--Navajo Nation-Cove Mesa II Erosion Control
Results
$1,000,000 to $5,000,000 est. value
Red Rock, AZ

Phase 1 - Infrastructure AKA Hillside Drive
New Construction
Construction
Phoenix, AZ 85338

Indefinite Delivery / Indefinite Quantity (IDIQ) Irrigation Canal Construction
Post-Bid
$250,000 to $1,000,000 est. value
San Luis, AZ

Rittenhouse Road Bridge at Queen Creek Wash Improvements
Results
Queen Creek, AZ 85142

Subgrade Preparation, Road Reconditioning, Soil Stabilization, Gravel Base, Double Chip Seal and Signage
Post-Bid
Window Rock, AZ 86515

Upper San Simon Culvert Bridge Replacement
Results
Safford, AZ

Subgrade Preparation, Road Reconditioning, Gravel Base, Double Chip Seal, Culvert Installation and Signage
Post-Bid
Window Rock, AZ 86515

Colorado River Wash Fan Sediment and Rock Removal IDIQ for Arizona, California and Nevada
Results
$250,000 to $1,000,000 est. value

Route N6730 - Tolani Lake Chapter; Low Water Crossing
Post-Bid
Window Rock, AZ

Western Canal Crossing Improvements
Results
Less than $97,855 est. value
Chandler, AZ

Parking Lot Drainage
Post-Bid
Window Rock, AZ 86515

Last Updated 12/22/2020 04:06 PM
Project Title

Silver Creek and Secret Pass Wash Flood and Erosion Mitigation Project

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the construction of approximately 1,600 linear feet of containment dikes near the inlet locations of two existing roadway culvert crossings beneath Bullhead Parkway, for Silver Creek and Secret Pass Wash. The flood flow containment dikes will be protected from erosion using cement-stabilized alluvium (CSA), elevated to the 100-year water surface profile plus freeboard, and toed-down to scour depths.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents