Similar Projects
Last Updated | 09/28/2022 08:50 AM |
Project Title | RFP - Utility Analysis Service |
Physical Address | View project details and contacts |
City, State (County) | New Haven, CT 06510 (New Haven County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of New Haven is requesting proposals from firms that are experts in analyzing and reviewing (based on contracts) utility invoices for the City and Board of Education on a monthly or quarterly basis. The priority utilities include electricity, natural gas, sewer and water, telecommunications, and street lighting. (a) The City will not respond to a Respondent's request(s) for oral interpretation and/or clarification of the RFP Specifications for any reason. (b) The City will respond to a Respondent's written request(s) for interpretation and/or clarification of the RFP Specifications. (1) Any written Inquiry for Clarification must be received seven (7) or more business days prior to the RFP Opening Date and Time. Any request received by the City after this deadline will not be given consideration. (2) Every request for such an interpretation shall be made in writing via email (3) Please do not send questions or requests for clarification in a PDF format. (4) Every interpretation made to a Respondent will be in the form of an Addendum to the RFP Documents. The City reserves the right to reject any and all RFPs which do not meet the requirements of a lowest qualified responsible Respondent. Some reasons for rejection include but are not limited to: altered or qualified Calculation Sheet, a non-Web based Calculation Sheet, non-conforming Bid Bonds, incomplete or erroneous paperwork, late RFP Submission, Unbalanced High or Low Unit Pricing, and/or not habitually performing with the Respondent's own forces. The Method of Contractor Selection has not been determined at this Time. The City reserves the right to reject any and all RFPs which do not meet the requirements of a lowest qualified responsible Respondent. Some reasons for rejection include but are not limited to: altered or qualified Calculation Sheet, a non-Web based Calculation Sheet, non-conforming Bid Bonds, incomplete or erroneous paperwork, late RFP Submission, Unbalanced High or Low Unit Pricing, and/or not habitually performing with the Respondent's own forces. The Method of Contractor Selection has not been determined at this Time. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |