Similar Projects
Fy22 - Lake Marion Providence Reach-Water Line
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Charleston, SC

Saluda Gardens Water System Improvements - Division II
Infrastructure
Bidding
$420,000 est. value
West Columbia, SC

Musc Ashley River Tower Water Intrusion
Alteration
Bidding
$300,000 est. value
Charleston, SC 29401

2020 Water System Improvements
Post-Bid
Less than $260,000 est. value
Lexington, SC 29835

Various Pipe Fittings and Other Accessories for Stock
Post-Bid
SC

Beach Club Villas Water Main Replacement
Results
Isle of Palms, SC 29451

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Line Replacement - Carolina Lane and Stabler Hill
Infrastructure
Bidding
Swansea, SC 29160

Sewer and Water Lines Project
Post-Bid
Florence, SC 29063

2020 Waterline Improvement Projects Pipe, Valves and Various Materials
Results
Less than $38,000 est. value
North Augusta, SC 29861

Mt. Zion Elementary School - Auldreeke Road Water Main Improvements
Infrastructure
Bidding
Johns Island, SC 29455

Advanced Metering Infrastructure System
Post-Bid
West Columbia, SC

Backflow Prevention Assembly Installation, Testing And Repair
Results
Pawley's Island, SC 29585

Crabtree Force Main/Park Hill Pump Station
Renovation, Infrastructure
Bidding
$550,000 est. value
Conway, SC 29526

5 Mueller Super Centurion 250 Fire Hydrants
Post-Bid
York, SC

Last Updated 04/18/2022 08:28 AM
Project Title

Highway 274 Force Main Replacement

Physical Address View project details and contacts
City, State (County) SC   (York County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this project consists of furnishing all labor, materials, equipment, tools, transportation, services and incidentals; and of performing all work necessary to complete all specified work in accordance with the Contract Documents prepared therefore and entitled Highway 274 Force Main. The work generally consists of constructing approximately 28,000 LF of sanitary sewer force main along Highway 274. This project will replace an existing 12” main that flows from Crowders Creek wastewater pump station to the Allision Creek pump station. Materials include, but are not limited to, 24” DIP, 24” fusible PVC, 20” DIP, 8” DIP, 6” DIP, 4” DIP, and 2” PVC. Construction will warrant 7 roadway crossings and 2 directional drills.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents