Similar Projects
Construction Manager at Risk for Design Phase Assistance and Complete Construction Services for New City Hall
Design
$10,000,000 est. value
Tolleson, AZ 85353

Maricopa County Sherriff's Office 2 Substation
Renovation - 33,756 SF
Results
Avondale, AZ

Southeast Justice Center
Results
$24,000,000 to $27,000,000 est. value
AZ

Central Courts Remodel 12th Floor
Renovation
Results
Phoenix, AZ

Court Building Renovations
Renovation
Design
$3,000,000 est. value
Glendale, AZ 85301

City Hall Building Renovation
Renovation
Design
$1,620,000 est. value
Avondale, AZ 85323

Municipal Court Lobby Expansion
Renovation, Addition
Design
$1,556,000 est. value
Avondale, AZ 85323

City Hall Space Planning Tenant Improvements
Renovation
Design
$500,000 est. value
Buckeye, AZ

South East Juvenile Courts and Office Renovations
Renovation
Design
Mesa, AZ 85210

Superior Court Central Building 11th Floor
Renovation - 19,300 SF
Design
Surprise, AZ 85374

House and Senate Capitol Projects - CMAR
Renovation, Term Contract
Post-Bid
$6,500,000 est. value
Phoenix, AZ 85007

Guadalupe Council Chambers Improvements
Renovation
Post-Bid
Guadalupe, AZ 85283

Downtown Campus Modernization
Renovation
Conception
$65,000,000 est. value
Glendale, AZ 85301

Renovation Of Central Courts 11Th Floor
Renovation
Results
$63,953 est. value
Phoenix, AZ 85003

Southeast Juvenile Courtroom and Office Renovation
Renovation - 68,500 SF
Bidding
$25,000,000 est. value
Goodyear, AZ

Reported 06/24/2022 08:29 AM
Project Title

Glendale OPS Campus Renovation - CIPFC23041

Physical Address View project details and contacts
City, State (County) Glendale, AZ   (Maricopa County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $6,207,197 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to renovate and demolish the existing buildings at the operations campus for adaptive re-use. Future phases from the current Master Plan such as paving, future fire resources, and carwash replacement are not included nor funded. This project is included in the city's 2023-2032 Capital Improvement Plan (CIP). As of June 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.Total sq ft for project not available at this time.

Details

Capitol/Court House/City Hall, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents