Similar Projects
Burns Pathway Phases 1-3 and North Road 93-Powerline Pathway (Phase 4)
Infrastructure
Bidding
$375,000 to $475,000 est. value
Pasco, WA 99301

WSU LID Frontage Improvements Phase 4B
Infrastructure
Bidding
$1,000,000 to $1,500,000 est. value
Puyallup, WA

Garrison Middle School Sidewalk Improvement
Infrastructure
Post-Bid
Walla Walla, WA 99362

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

2021 Complete Streets Pedestrian Improvements Project
Infrastructure
Bidding
$130,000 to $150,000 est. value
Mill Creek, WA

Ephrata Headquarters Pedestrian Crosswalk Replacement
Infrastructure
Post-Bid
$90,000 est. value
Ephrata, WA

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Central Avenue ,Main Street Resurfacing and Deerpath ,Kay Water Main Improvements
Infrastructure
Bidding
$600,000 to $700,000 est. value
Oroville, WA

Parking Lot Preservation Phase Two
Alteration
Post-Bid
$846,000 to $951,000 est. value
Tumwater, WA 98501

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Sr 525, Clinton Ferry Terminal Vicinity Pedestrian Connectivity
Infrastructure
Bidding
$750,000 to $1,000,000 est. value
WA

WDFW - Roses Lake Access Redevelopment Phase Two Rebid - Manson
Infrastructure
Post-Bid
$186,400 est. value
Manson, WA 98831

Remove and Replace Existing Sidewalk Panels with Glass Inserts
Infrastructure
Results
Roslyn, WA 98941

Last Updated 12/16/2021 01:34 AM
Project Title

SR 525, Mukilteo Pedestrian and Traffic Improvements MP 8.32 to MP 8.43

Physical Address View project details and contacts
City, State (County) WA   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Veteran Goal:5% Sr 525 In Snohomish County, Mp 8.32 To Mp 8.43, Mukilteo Pedestrian And Traffic; Improvements By Planing Bituminous Pavement, Paving With Hma, Sidewalk Construction With Curb Ramps, Retaining Wall Construction, Stairway Construction, Removing Existing Overlay From Bridge Deck, Replacing Existing Expansion Joints, Applying Waterproof Membrane, Pavement Marking, Temporary Erosion And Water Pollution Control, Roadside Restoration, Traffic Control

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents