Similar Projects
Carbon River Road Erosion Control Mount Rainier National Park
Infrastructure
Bidding
$250,000 to $500,000 est. value
Carbonado, WA 98323

Stormwater Swale and Pond Rehabilitation - Various Areas
Infrastructure
Bidding
$270,000 est. value
Tacoma, WA

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Special Market Request for Contech Engineered Solutions Services
Infrastructure
Post-Bid
$100,000 est. value
Tacoma, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

Rody Creek Channel Stabilization Between 80th Street East and 72nd Street East
Infrastructure
Post-Bid
$900,000 to $1,500,000 est. value
Tacoma, WA 98417

Orville Road Engineered Log Jam Setback Revetment Phase
Infrastructure
Results
$2,000,000 to $4,000,000 est. value
WA

Wapato Creek Diversion Repair
Infrastructure
Post-Bid
Puyallup, WA

92nd Avenue East/224th Street East
Alteration
Results
$2,700,000 to $4,000,000 est. value
WA

CRP 5736 Canyon Road East - 400 ft. n/o of 84th St E to 72nd Street East
Infrastructure
Results
$6,000,000 to $8,000,000 est. value
Tacoma, WA 98417

2022 Stormwater Repair
Infrastructure
Results
$261,000 to $289,000 est. value
Lakewood, WA 98499

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

Horsehaven Creek Fish Passage Culvert at 188th Street Crossing Project D231
Infrastructure
Results
$686,175 est. value
Frederickson, WA 98375

Foss Waterways Site 10, 12, and Municipal Dock Bulkhead Replacement
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
Tacoma, WA 98402

Reported 06/07/2022 12:00 AM
Project Title

Salmon Creek Cutover

Physical Address View project details and contacts
City, State (County) Sumner, WA 98390   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $110,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

North of 60th Street E: Remove and salvage sheet piles. Install backflow preventer in the 32-inch CMP culvert under the private drive to prevent fish passage. Conduct grading within the Salmon Creek channel to remove debris in front of and behind the sheet piles. Rehabilitate the existing 32-inch CMP culvert under the private drive using slip-lining or Cured in Place Pipe. Rehabilitate the existing 24-inch Concrete culvert under Sumner-Tapps Highway that outfalls into the former creek South of 60th Street E: Rehabilitate the existing 36-inch CMP culvert under 60th Street E. North of 64th Street E: Salvage, clean, and stack the removed sheet within the pond fencing at the north end of the pond within the turn around area. Conduct filling and grading to transfer flow from the existing channel to the new channel. Rehabilitate the 24" CMP culvert under Sumner-Tapps Highway.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Bored Piles.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents