Similar Projects
US Business 24 at MP 0.146
Bidding
Less than $1,000,000 est. value
CO

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Bridge Design, Construction, and Delivery
Post-Bid
Platteville, CO 80651

Bridge Expansion Joint
Post-Bid
Denver, CO 80204

Mesa-16-Q.5 Bridge Replacement
Results
Less than $1,672,643 est. value
Grand Junction, CO 81501

Design-Build Services for Willow Springs Ponds Pedestrian Bridge
Results
$75,000 to $200,000 est. value
Colorado Springs, CO 80905

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Hess Ranch Metropolitan District No. 6 – Filing 1 Bridges Project
Post-Bid
Parker, CO

Removal of Asphaltmat (Planing), Placement of Thin Bonded Polyester Concrete Overlay,Replacement of Bridge Joints and Bearings
Results
$5,000,000 to $20,000,000 est. value
Glenwood Springs, CO

Construction Management Services
Post-Bid
Englewood, CO 80110

Construction Manager (“CM”) Services
Results
CO

Wagon Creek Beekman Road Crossing
Post-Bid
San Luis, CO

High Line Canal Underpass at Hampden and Colorado
Results
$5,300,000 to $5,800,000 est. value
Denver, CO 80202

Bridge Repair Project West 44th Ave over Clear Creek
Post-Bid
$300,000 to $350,000 est. value
Wheat Ridge, CO

I-76 over Clear Creek Bridge Rehabilitation Project on MP 2.901 on I-76
Results
$1,000,000 to $5,000,000 est. value
CO

Last Updated 01/04/2021 12:47 PM
Project Title

Park Avenue Viaduct Preventative Maintenance Phase 2

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,300,000 to $15,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation work on the Park Avenue Viaduct structure. Work items include: expansion joint replacement, deck repairs, signal replacement, asphalt overlay, and potentially, painting of steel. Extensive coordination with RTD, UPRR, BNSF, and the Colorado Rockies will be required. Traffic control restrictions will be in place anytime there will be a Colorado Rockies home baseball game. This project will also require extensive Public Information Services.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents