Similar Projects
Oakwood District Intercommunity Relief Sewer Modification at Oakwood District - 222001 - Great Lakes Water Authority
Infrastructure
Conception
$53,466,000 CJ est. value
Detroit, MI 48226

Grosse Ile Parkway Bridge / Trenton Channel, Phase 2 - 30-424 - Wayne County
Infrastructure, Renovation
Conception
$2,800,000 CJ est. value
Grosse Ile, MI 48138

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

Wayne Road over Tonquish Creek Bridge Reconstruction
Infrastructure
Bidding
$600,000 CJ est. value
Westland, MI 48185

Renovation of Hazmat Facility
Renovation, Infrastructure
Bidding
$3,731,886 CJ est. value
Detroit, MI 48209

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Tipton Academy Charter School
Renovation
Post-Bid
Garden City, MI 48135

Burger Baylor Gutters Replacement
Alteration
Results
Inkster, MI 48141

Senior Center Parking Lot Replacement
Infrastructure
Results
$176,520 CJ est. value
Rockwood, MI 48173

Remove and Replace Sidewalks
Infrastructure
Construction
$200,000 CJ est. value
Highland Park, MI 48203

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Chipotle / Canton
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, MI 48188

Allen / CN RR Grade Separation - 30-217B - Wayne County
New Construction, Infrastructure
Conception
$27,000,000 CJ est. value
Woodhaven, MI 48183

RUSD 2022 Bond Projects - Future Phases
Renovation
Design
$34,500,000 est. value
MI

Last Updated 11/21/2022 04:33 PM
Project Title

Barnes Elementary School - 2022 Bond - Flat Rock Community Schools

Physical Address View project details and contacts
City, State (County) Flat Rock, MI 48134   (Wayne County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes exterior work, interior work, HVAC improvements, lighting improvements, and site paving and improvements. As of November 21, 2022, this project is in the conceptual phase. The bond has been approved. A design firm has been selected for the project. Information regarding the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents