Similar Projects
Lake Murray Water Treatment Plant Filter 6 Addition
Post-Bid
$1,000,000 est. value
Lexington, SC 29072

Plum Island WPCP Phase 4 Capital Improvements Project
Post-Bid
$50,000,000 to $65,000,000 est. value
Charleston, SC 29401

Water Treatment Plant Basin Rehabilitation Project
Results
$350,000 est. value
Union, SC 29379

Highway 38 Well and Treatment Plant
Results
Bennettsville, SC

Breezy Hill/Charles A. Hilton Water Treatment Plant Expansion and Improvements
Addition
Construction
$2,000,000 est. value
Graniteville, SC

Clearwater Finishing Industrial Wwtp Demolition And Closure
Demolition
Construction
$800,000 est. value
Clearwater, SC

Surface Water Plant Filter Media Replacement
Post-Bid
Florence, SC 29506

Waccamaw Neck WTP Filter Valves Replacement
Results
Pawleys Island, SC 29585

Aerator Replacement Project
Post-Bid
Batesburg, SC

Waccamaw Neck WTP Flocculator Replacement Project
Results
Pawley's Island, SC

Screw Pump Replacement and Sludge Dewatering Improvements Project
Post-Bid
Batesburg, SC

Upper Wastewater Treatment Plant Aeration Improvements
Results
Saint George, SC 29477

Addie Road, Sudlow Lake Road And Connector Road Water Interconnections
Renovation, Alteration
Post-Bid
Graniteville, SC

WTP Torque Tube Repair and Replacement
Alteration
Post-Bid
SC

Plantation Pointe Pump Station
New Construction
Post-Bid
Prosperity, SC

Last Updated 10/01/2021 01:43 PM
Project Title

Center Street Wastewater Treatment Plant Headworks Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Mount Pleasant, SC 29465   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,168,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of rehabilitation and modifications to the Owner’s existing headworks structure and process equipment at the Center Street Wastewater Treatment Plant, rated for 3.7 MGD annual average flow rate. Construction may include the following: • Maintenance of plant operations (MOPO) – CSWWTP must remain operational. • Rehabilitation of the headworks structure • Retrofitting, replacing and/or removing & reinstalling process equipment • Installation of electrical equipment The Work includes, but is not limited to, all piping and valves, grading and paving, sedimentation and erosion control, electrical work, and all other work necessary to render the facilities complete and operational. All work will be completed in accordance with local, state, and federal permits and regulations.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents