Similar Projects
24" Main from Cambridge Street to Cool Springs Road - 342-02 - Stafford County
Infrastructure
Conception
$5,724,000 CJ est. value
Stafford, VA 22554

24" Main from Cambridge Street to Cool Springs Road - 342-02 - Stafford County
Infrastructure
Conception
$5,724,000 CJ est. value
Stafford, VA 22554

Red Apple Pediatric
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Stafford, VA 22556

Burns Corner Medical Office Building
New Construction, Infrastructure - 42,000 SF
Design
$20,000,000 CJ est. value
Stafford, VA 22554

St. Clair Brooks Park Stream Restoration
Infrastructure
Bidding
$1,639,000 CJ est. value
Falmouth, VA 22405

Lake Arrowhead Dam Renovation
Infrastructure
Bidding
$320,000 CJ est. value
Stafford, VA 22556

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Corrective Maintenance and Repairs for Water, Sewer and Storm Water Systems
Term Contract
Post-Bid
$100,000 est. value
Dahlgren, Fredericksburg, Stafford, VA

Subgrade Stabilization
Infrastructure
Results

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Leeland Road Widening - Stafford County
Infrastructure
Pending Verification
$7,975,712 CJ est. value
Falmouth, VA 22405

2019 Transportation Bond - Shelton Shop Road - Stafford County
Infrastructure
Pending Verification
$13,979,860 CJ est. value
Stafford, VA 22554

Utilities: 342-05.5 24 Water Transmission Main Kelley Road To Beagle Road - BHC072 - Stafford County
Infrastructure
Conception
$1,381,000 CJ est. value
Stafford, VA 22554

Bridge Repairs Over Rappahannock River
Infrastructure
Bidding
$4,500,000 CJ est. value
Stafford, VA 22554

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Last Updated 09/07/2022 02:04 AM
Project Title

A-115 - Aquia Bridge Force Main - County of Stafford

Physical Address View project details and contacts
City, State (County) Stafford, VA 22554   (Stafford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2027
Bids Due View project details and contacts
Estimated Value $2,910,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE : https://stories.opengov.com/staffordcountyva/published/b_tlGsqbMk4 This project (A-115) includes the replacement of various sections of force main with an 18 inch force main between Aquia Creek (Crucifix) Pump Station and the Aquia Wastewater Treatment Facility. The purpose of the project is to increase the capacity of the force mains from Aquia Creek (Crucifix) Pump Station and Aquia Bridge Pump Station. The timing for construction of this project is dependent on the timing of increased flows in this area. Phase 1 includes connection of a dormant 18 force main to force mains on Aquia Drive and installation of 14 and 18 force mains and 24 gravity sewer along Coal Landing Road to the Aquia Wastewater Treatment Facility. Project Code: FDB010 Project is included Stafford County FY 2023 - 2032 Adopted Capital Improvement Program. A115 Aquia. -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project (A-115) includes the replacement of 14 inch and 12 inch sections of a force main with an 18 inch force main near Starboard Cove Lane (6,976 feet). The purpose of the project is to increase the capacity of the force main. The timing for construction of this project is dependent on the timing of flows in this area. Location: This project replaces a force main that conveys flow from near the Aquia Wastewater Pump Station, through Aquia Harbor, to the Aquia Wastewater Treatment Facility. The purpose of the project is to increase the capacity of the force main. As of September 3 2021, this project is currently in the FY 2022-2031 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2027. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents