Similar Projects
Traffic Signal Installation-3 Driveways - Lenardo Dr at FOLA Driveways - PW1616 - City of Carson
Infrastructure
Conception
$1,500,000 est. value
Long Beach, CA 90745

Traffic Signal Installation - Main Street at Lenardo Drive - PW1613 - City of Carson
Infrastructure
Conception
Less than $500,000 est. value
Carson, CA 90745

Install Protected Left Turn, Modify Existing Traffic Control Signal, and ADA
Infrastructure
Design
$1,095,000 est. value
Los Angeles, CA 90045

Modify Existing Traffic Signal Controls Including Installation of Left Turn Channelization
Infrastructure
Design
$1,217,000 est. value
Los Angeles, CA 90081

Cordova Street Enhancements Project
Infrastructure
Bidding
$4,100,000 to $5,100,000 est. value
Pasadena, CA 91199

Backlog Reduction Project - Phase 1
Infrastructure
Bidding
$800,000 est. value
Los Angeles, CA

Traffic Signal & Street Lighting Equipment
Infrastructure, Alteration
Post-Bid
Long Beach, CA 90899

Valley View Avenue & Rosecrans Avenue Intersection Improvements
Infrastructure
Post-Bid
$617,000 to $620,000 est. value
Santa Fe Springs, CA 90670

Campus Wayfinding and Signage Plan
Alteration
Results
La Verne, Walnut, CA 91789

Los Coyotes Diagonal, From Outer Traffic Circle To Carson Street
Infrastructure
Results
$733,500 est. value
Long Beach, CA 90899

Traffic Signal Installation-Corporate Yard Entrance on Broadway and Main Street - PW1612 - City of Carson
Alteration
Conception
$1,000,000 est. value
Carson, CA 90248

Install Protected Left-turn Signal Phases for Southbound Movements, Extend Left-turn Lane
Infrastructure
Design
$803,000 est. value
Los Angeles, CA 90045

Citywide Pedestrian Safety Improvement Project
Infrastructure
Bidding
$1,908,649 est. value
Los Angeles, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Modify Signal, Lighting and Ramp Metering Systems
Infrastructure
Results
$760,000 est. value
CA

Last Updated 07/11/2022 11:54 PM
Project Title

Traffic Signals Improvements

Physical Address View project details and contacts
City, State (County) Whittier, CA 90603   (Los Angeles County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of providing traffic signal improvements for the signalized intersections of Hadley Street/Pickering Avenue, Mar Vista Street/Pickering Avenue, and Mar Vista Street/Greenleaf Avenue. Hadley Street/Pickering Avenue Work includes but not limited to: upgrades to signal equipment such as a new traffic signal controller cabinet assembly with new controller cabinet, controller unit, and battery backup system, new traffic signal poles, new vehicle heads with 12" indications, LED countdown pedestrian heads, ADA compliant audible Accessible Pedestrian Signal (APS) push button system, Emergency Vehicle Pre-emption system (EVP), internally illuminated street name signs, ADA compliant curb ramps, video detection system, signal cabling, installation of new conduits, and pull boxes, crosswalk enhancements, and minor striping modification indicated on plans. Mar Vista Street/Pickering Avenue Work includes but not limited to: upgrades to signal equipment such as a new traffic signal controller cabinet assembly with new controller cabinet, controller unit, and battery backup system, new traffic signal poles, new vehicle heads with 12" indications, LED countdown pedestrian heads, ADA compliant audible Accessible Pedestrian Signal (APS) push button system, Emergency Vehicle Pre-emption system (EVP), internally illuminated street name signs, ADA compliant curb ramps, video detection system, new service cabinet Type III-BF, signal cabling, installation of new conduits, and pull boxes, crosswalk enhancements, and minor striping modification indicated on plans. Mar Vista Street/Greenleaf Avenue Work includes but not limited to: upgrades to signal equipment such as a new traffic signal controller cabinet assembly with new controller cabinet, controller unit, and battery backup system, new vehicle heads with 12" indications, LED countdown pedestrian heads, ADA compliant audible Accessible Pedestrian Signal (APS) push button system, Emergency Vehicle Pre-emption system (EVP), internally illuminated street name signs, ADA compliant curb ramps, video detection system, new service cabinet Type III-BF, signal cabling, installation of new conduits, and pull boxes, crosswalk enhancements, and minor striping modification indicated on plans. In accordance with the project specifications as specified hereinafter for the City of Whittier, Los Angeles County, State of California Standard Plans and Specifications latest edition and the Manual on Uniform Traffic Control Devices (CA MUTCD 2014, Revision 6), and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2021 Edition, and the Standard Specifications of the State of California, Department of Transportation, latest edition. All improvements shall meet the health Department and ADA requirements. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project. Contractor required to pull the permits required from the City of Whittier.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents