Similar Projects
Last Updated | 07/11/2022 11:54 PM |
Project Title | Traffic Signals Improvements |
Physical Address | View project details and contacts |
City, State (County) | Whittier, CA 90603 (Los Angeles County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of providing traffic signal improvements for the signalized intersections of Hadley Street/Pickering Avenue, Mar Vista Street/Pickering Avenue, and Mar Vista Street/Greenleaf Avenue. Hadley Street/Pickering Avenue Work includes but not limited to: upgrades to signal equipment such as a new traffic signal controller cabinet assembly with new controller cabinet, controller unit, and battery backup system, new traffic signal poles, new vehicle heads with 12" indications, LED countdown pedestrian heads, ADA compliant audible Accessible Pedestrian Signal (APS) push button system, Emergency Vehicle Pre-emption system (EVP), internally illuminated street name signs, ADA compliant curb ramps, video detection system, signal cabling, installation of new conduits, and pull boxes, crosswalk enhancements, and minor striping modification indicated on plans. Mar Vista Street/Pickering Avenue Work includes but not limited to: upgrades to signal equipment such as a new traffic signal controller cabinet assembly with new controller cabinet, controller unit, and battery backup system, new traffic signal poles, new vehicle heads with 12" indications, LED countdown pedestrian heads, ADA compliant audible Accessible Pedestrian Signal (APS) push button system, Emergency Vehicle Pre-emption system (EVP), internally illuminated street name signs, ADA compliant curb ramps, video detection system, new service cabinet Type III-BF, signal cabling, installation of new conduits, and pull boxes, crosswalk enhancements, and minor striping modification indicated on plans. Mar Vista Street/Greenleaf Avenue Work includes but not limited to: upgrades to signal equipment such as a new traffic signal controller cabinet assembly with new controller cabinet, controller unit, and battery backup system, new vehicle heads with 12" indications, LED countdown pedestrian heads, ADA compliant audible Accessible Pedestrian Signal (APS) push button system, Emergency Vehicle Pre-emption system (EVP), internally illuminated street name signs, ADA compliant curb ramps, video detection system, new service cabinet Type III-BF, signal cabling, installation of new conduits, and pull boxes, crosswalk enhancements, and minor striping modification indicated on plans. In accordance with the project specifications as specified hereinafter for the City of Whittier, Los Angeles County, State of California Standard Plans and Specifications latest edition and the Manual on Uniform Traffic Control Devices (CA MUTCD 2014, Revision 6), and in accordance with the Standard Specifications for Public Works Construction (The Greenbook), 2021 Edition, and the Standard Specifications of the State of California, Department of Transportation, latest edition. All improvements shall meet the health Department and ADA requirements. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project. Contractor required to pull the permits required from the City of Whittier. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |