Similar Projects
Cold Inplace Recycling, Bituminous Overlay and Aggregate Shoulders CP 50-21-02
Post-Bid
MN

North Smoky Hills Graveling
Renovation
Post-Bid

Concrete Street Reconstruction
Results
Austin, MN

2021 Bituminous Street Reconstruction
Results
$815,000 est. value
Austin, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Grading, Bituminous Surfacing, Lighting, ADA Improvements
Results
MN

Bituminous Street Reconstruction-8th Avenue Southwest and 8th Place/Avenue Northwest
Results
$198,765 est. value
Austin, MN 55912

Concrete Paving 18th Avenue Northwest Median Improvements
Results
$88,750 est. value
Austin, MN 55912

Concrete Construction - 4th Street Northwest and 3rd Avenue Northwest
Results
$458,185 est. value
Austin, MN 55912

Bridge Removal, Concrete Box Culverts, Full Depth Reclamation, Grading, and Aggregate Surfacing
Infrastructure
Results
Austin, MN

Bridge Removal, Concrete Box Culverts, Full Depth Reclamation, Grading and Aggregate Surfacing
Infrastructure
Results
Austin, MN

Bituminous Street Reconstruction 27th Avenue NW
Infrastructure
Results
$161,115 est. value
Austin, MN 55912

Turtle Creek to Minnesota/Iowa Border Bituminous Mill and Overlay, ADA Improvements, and Pedestrian Crosswalk Flasher System
Infrastructure
Results
MN

Grading, Bituminous Milling and Surfacing, ADA Improvements, and Bridge No.s 9706, 9856, 9857, and 9858 8.626 Miles
New Construction, Infrastructure
Results

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Last Updated 04/15/2022 08:49 AM
Project Title

Mill Bituminous Surface, Cold Inplace Recycling, Bituminous Overlay and Aggregate Shoulders

Physical Address View project details and contacts
City, State (County) Ostrander, MN   (Mower County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mill Bituminous Surface, Cold Inplace Recycling, Bituminous Overlay, And Aggregate Shoulders Sap 050-603-021; Located On Csah 3 (190th St 790th Ave, 180th St) From Csah 8 East County Line In Sections 18 & 24 In Bennington Township. Approximate Length: 6.932 Miles. The Approximate Major Quantities Of Work Are: 5,746 Ton Shoulder Base Aggregate Class 2; 409 Ton Bituminous Material For Mixture; 17,702 Ton Type Sp 12.5 Wearing Course Mixture (3,c); 100,522 Sy Cold-In-Place Recycled / Cold Central Plant Recycling Bituminous. Sap 050-604-029; Located On Csah 4 (170th St) From Th 56 To a Point 1157 Ft North Of The Se Cor Sec 34 On Csah 4 (660th Ave) In Sections 34 & 36 In Windom & Marshall Townships. Approximate Length: 5.398 Miles. The Approximate Major Quantities Of Work Are: 3,280 Ton Shoulder Base Aggregate Class 2; 356 Ton Bituminous Material For Mixture; 13,320 Ton Type Sp 12.5 Wearing Course Mixture (3,c); 78,850 Sy Cold-In-Place Recycled / Cold Central Plant Recycling Bituminous. Sap 050-605-016; On Csah 5 (140th St) From Th 105 To Th 218 In Sections 9, 10, & 11 In Lyle Township. Approximate Length: 2.909 Miles. The Approximate Major Quantities Of Work Are: 2,583 Ton Shoulder Base Aggregate Class 2; 173 Ton Bituminous Material For Mixture; 7,648 Ton Type Sp 12.5 Wearing Course Mixture (3,c); 42,418 Sy Cold-In-Place Recycled / Cold Central Plant Recycling Bituminous. Cp 050-22-01 & Cp 050-22-02; On Cr 58 (210th St & 560th Ave) Between Csah 3 And i-90 And Cr 58 And Th 56 In Sections 4, 6, 7 In Lyle Township. Approximate Length: 4.60 Miles. The Approximate Major Quantities Of Work Are: 5,462 Ton Shoulder Base Aggregate Class 2; 272 Ton Bituminous Material For Mixture; 12,439 Ton Type Sp 12.5 Wearing Course Mixture (3,c); 66,645 Sy Cold-In Place Recycled / Cold Central Plant Recycling Bituminous.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents