Similar Projects
FPL Avenir Substation
New Construction - 540 SF
Design
Less than $500,000 CJ est. value
West Palm Beach, FL 33412

Split Oak Substation Construction Project
Post-Bid
Orlando, FL 32832

Storm Restoration Services - Utility Power Infrastructure
Renovation
Post-Bid
Keystone Heights, FL 32656

Design-Build Contract for Sampson Substation Autotransformer No. 2 Replacement 2019
Results
Jacksonville Beach, FL 32227

Berth 1 Shore Power Replacement
Results
Riviera Beach, FL 33404

FPL Westlake Substation
New Construction
Construction
Westlake, FL 33470

T-Mobile Jacksonville Mso Switch Cooling
Construction
$3,066,225 est. value
Jacksonville, FL 32256

Emergency Power Restoration
Renovation
Post-Bid
Live Oak, FL 32060

Substation and Generating Station Maintenance Services
Results
Orlando, FL 32800

Electric Pole Top Repairs Via Helicopter
Post-Bid
Tavernier, FL

Design-Build New White Substation
New Construction
Results
Less than $3,800,000 est. value
Ocala, FL 34471

Specifications To Remove And Replace Diesel Generator
Renovation
Post-Bid
Marathon, FL

Construction BP6 Electrical Substation
Results
Tallahassee, FL 32301

Wauchla Substation Construction
Post-Bid
Wauchula, FL 33873

JEA Northside Generating Station (NGS) Breakroom Upgrade
Results
Jacksonville, FL 32226

Last Updated 09/18/2020 01:28 PM
Project Title

Hord Substation Third Transformer Addition Project

Physical Address View project details and contacts
City, State (County) Kissimmee, FL 34741   (Osceola County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Hord Substation which will involve both construction of new substation facilities including Owner supplied 69kV bus structures and switches, transformer, 15kV metalclad switchgear, and metal enclosed capacitor bank and modification of existing relay panels within the existing substation facilities. New and modified facilities will be constructed immediately adjacent to existing energized lines and bus work. Only trained and qualified personnel will be allowed to work on-site.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents