Similar Projects
2019 Gym Floor Refinish and Restoration
Post-Bid
Tampa, FL 33610

M.C Blanchard Judicial Building Carpet Replacement
Post-Bid
Pensacola, FL 32502

Public Safety Building Repairs
Results
Less than $10,100 est. value
Callaway, FL 32404

Replace the Flooring for the Wewahitchka High School Commons Area
Results
Wewahitchka, FL 32465

Composite Coat Floors and Containment Basins at Water/Wastewater Plants
Post-Bid
Less than $750,000 est. value
Tampa, FL 33601

Replacement of Volusia County Fire Stations Concrete Floor Coatings
Results
Less than $32,895 est. value
De Land, FL 32720

Miramar Town Center Building W 2nd Floor Flooring Project
Post-Bid
Miramar, FL 33025

District Energy System (DES) Floor Resurfacing
Results
Jacksonville, FL 32202

Community Center - Flooring
Post-Bid
Port Saint Lucie, FL 34984

Concrete Floor Grinding
Results
$100,000 to $250,000 est. value
Marianna, FL

Regional Park Aquatics Lifeguard Room Flooring
Post-Bid
Miramar, FL 33025

North and Southwest RO WTP Coatings, Gratings, and Access Platform
Results
Cape Coral, FL 33993

Halifax Health Port Orange Hospital Flooring
Post-Bid
Port Orange, FL 32127

Installation of Vinyl Tile at USCG Air Station Miami
Results
Opa-locka, FL

Flooring Replacement for Broward Health Medical Center Atrium Building
Post-Bid
Fort Lauderdale, FL 33316

Reported 04/04/2020 12:00 AM
Project Title

Flooring Services - Macdill AFB, FL

Physical Address View project details and contacts
City, State (County) Macdill AFB, FL 33621   (Hillsborough County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1.1.1. Removal of existing flooring and base, installation of new flooring and base, sanding and finishing wood base, removal of existing stair treads landings and risers, lifting, moving and relocating existing standard office furniture and/or systems furniture to facilitate the installation of the new materials. Upon completion, replacing the furniture to its original location, work area clean-up to include removal of all debris, cleaning and removal of all exposed adhesives and vacuuming of carpeted areas to a clean condition with no visible debris. 1.1.2 Installation of new flooring, trim, stair treads, risers, stringers and accessories.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents