Similar Projects
USACE Houston Ship Channel Spillman Placement Area Improvements
Renovation
Design
$5,000,000 to $10,000,000 est. value
TX

County Road Improvements
Infrastructure
Bidding
Anson, TX

Drainage and Road Improvements in the Castlewood Subdivision Sections 3 and 4, Precinct 2
Infrastructure
Bidding
Houston, TX

Drainage Upgrades at Valley Hi Elementary School
Post-Bid
San Antonio, TX 78227

Construction of Westwood Subdivision Maple Leaf Box Culverts and Magnolia Creek Ditch Extension
Post-Bid
Houston, TX

Exploration Green Detention Facility Phase 3A
Results
Less than $5,520,000 est. value
Clear Lake City, TX 77058

Disaster Restoration and Recovery
Term Contract
Results
Cleveland, TX

7th Street Paving and Drainage Improvements
Infrastructure
Bidding
La Porte, TX 77572

Erosion Control Structure
Post-Bid
TX

Provide Super 2 Passing Lanes
Results
Less than $17,743,517 est. value
TX

Construction of Water, Sanitary, Drainage and Paving Facilities in Ladera Trails Section 2
Infrastructure
Bidding
$1,168,000 est. value
TX

Mossy Tree Glen & Tamarack Cove Drainage Improvements Projects
Post-Bid
Holly Lake Ranch, TX 75765

Water, Sanitary Sewer, and Drainage Facilities to Serve Pollard Boulevard Phase 2
Results
TX

Veterans Boulevard Drainage Improvements
Infrastructure
Bidding
Edinburg, TX 78540

Construction of Headwalls on Buller Road at Dry Branch
Post-Bid
Hempstead, TX 77445

Last Updated 06/11/2021 11:54 AM
Project Title

Rehabilitation to Floodwater Retarding Structure Site 10

Physical Address View project details and contacts
City, State (County) Lockhart, TX 78644   (Caldwell County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,725,994
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major items of work are: 3,400 LF. sediment filters; 21.2 acre vegetation, sprigging; 4,000 1000-gal. irrigation water; 42,416 CY excavation, common; 28,276 CY earthfill; 2,107 CY drainfill; 20,617 SY topsoil, lime treated earthfill; 1,340 SY topsoil, 6” placement; 300 LF diver-sions; 21,542 CY lime treated earthfill; 1,221 tons furnishing and handling lime; 52.3 CY concrete, structural; 42.4 CY concrete, pipe cradle; 8,349 lbs. reinforcing steel; 4,774 CY roller compacted concrete; 668.4 tons cementitious material; 206 LF concrete pipe, pressure 30” I.D.; 1,816 LF plastic pipe, PVC 6” I.D.; 4,393 tons rock riprap; 590 LF chain link fence; 3,570 LF barbed wire fence; 4,604 SY geotextile; and 1 Job/Lump Sum: structure removal, fences and principal spillway inlet; pollution control; irrigation system; construction surveys; mobilization and demobilization; removal of water; 12” x 12” slide gate; principal spillways metal work; contractor quality control; and conduit abandonment. [LF: A 5 percent bid guarantee is required.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents