Similar Projects
Parking Areas - Expo FY20
Bidding
OH

Parking Lot Overlay/Resurfacing and Curb Replacement
Post-Bid
Columbus, OH

Gate Replacement
Post-Bid
Columbus, OH 43211

Goodale Park Paver Replacement
Results
Columbus, OH

Operation Sidewalks-School Sidewalks 2018
Results
Columbus, OH

Northam Road Shared Use Path
Post-Bid
Upper Arlington, OH

Lancaster and Main Parking Lot - Phase 1
Results
Less than $492,687 est. value
Reynoldsburg, OH

Center Street Public Space, Parking Lot, and Trailhead Improvements (CIP LB-17)
Post-Bid
Less than $815,500 est. value
Hilliard, OH

Dublin Arts Council Entry Plaza Improvements
Results
Dublin, OH 43016

Installation of a Rectangular Rapid Flashing Beacon, Pedestrian Crossing with Refuge Island and Associated Curb Ramps
Post-Bid
$44,771 est. value
Worthington, OH

Short North SID-High Street Improvements Phase 3
Results
Less than $11,927,225 est. value
Columbus, OH

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Akron, Athens, Avon, Bellefontaine, Cincinnati, Columbus, Defiance, Huber Heights, Kent, Marietta, Mason, Saint Clairsville, Sidney, Wadsworth, Wheelersburg, Xenia, Youngstown, OH

ADA Curb Ramps - Citywide Curb Ramps 2018
Results
Less than $528,039 est. value
Columbus, OH

Bexley Parking Lot Repairs
Post-Bid
Bexley, OH 43209

Buckeye Parkway and Mallow Lane Intersection Improvements Project
Results
Less than $237,116 est. value
Grove City, OH

Reported 04/24/2019 12:20 PM
Project Title

Hilliard Latham Park Multipath Improvement LB - 22

Physical Address View project details and contacts
City, State (County) Hilliard, OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $115,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work consists of extending the existing walking path at the park. The new multi-use path is to be built around the pond and will extend to the 'Latham Square Apartments' project on the west side of the park. The new multi-use path consists of compacted aggregates. The existing asphalt path will remain at the park. Second project The scope of work consists of installing a new green infrastructure parking lot. The new lot will accommodate 38 car spaces and two handicap parking spaces, all with pervious pavement. The area around the bioswales will be asphalt.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents