Similar Projects
Replacement of Hot Water Heaters
Term Contract
Bidding
Edgefield, SC 29824

SC Department of Archives and History - Boilers Blowdown Separator
Post-Bid
$25,000 to $35,000 est. value
Columbia, SC 29223

South Carolina Archives and History Building - Replace Hot Water Heater(S)
Post-Bid
$35,000 to $40,000 est. value
Columbia, SC 29223

Kirkland Correctional Institution - Boiler Replacement
Results
$680,000 to $739,725 est. value
Columbia, SC

Water Treatment Services
Term Contract
Results
Columbia, SC 29201

J045--Boiler Life Expectancy and Damage Assessment Inspection
Post-Bid
Columbia, SC 29209

Boiler/Water Heater Penthouse
Results
Columbia, SC 29210

Autoclave And Boiler Maintenance - Hollings Marine Laboratory
Post-Bid
Charleston, SC 29412

Boilers and Pumps
Results
Columbia, SC 29208

DPS/DMV Headquarters Boiler Replacement
Alteration
Post-Bid
$250,000 to $480,000 est. value
Blythewood, SC 29016

USC 1600 Hampton Street Annex Mechanical Upgrades
Results
$350,000 to $400,000 est. value
Columbia, SC 29208

R22-30 Refrigerant
Alteration
Post-Bid
Columbia, SC

Intellihot Water Heaters
Results
Columbia, SC

Chiller Maintenance for Admin
Alteration
Post-Bid
SC 29201

Steam Fired Domestic Water Heater
Results
Columbia, SC

Reported 12/23/2021 12:00 AM
Project Title

Central Energy Plant (Cep) Planned Maintenance

Physical Address View project details and contacts
City, State (County) Columbia, SC 29229   (Richland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Perform scheduled Preventive Maintenance Orders, Demand Maintenance Orders, and Emergency repairs to designate heating and cooling and ancillary equipment in the Central Energy Plants (CEP) and in the field at Fort Jackson, SC. This includes, but is not limited to, boilers, chillers, Medium Temp Water (MTW) and Chilled Water (CHW) pumps, pipes, valves and fittings and variable frequency drives (VFDs). Also included are the water treatment chemical injection systems, which are necessary to inhibit corrosion in the machines, pumps and distribution headers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents