Similar Projects
Upgrade Track and Field - 2022 Bond - Abbott Independent School District
Infrastructure
Conception
$3,500,000 CJ est. value
Abbott, TX 76621

New Practice Gym - 2022 Bond - Abbott Independent School District
New Construction, Infrastructure
Conception
$1,300,000 CJ est. value
Abbott, TX 76621

Enclose the Outdoor Space Between Two Existing Building
Renovation, Infrastructure
Design
$500,000 CJ est. value
Aquilla, TX 76622

New Addition for Bobcat Contracting
Addition, Demolition, Infrastructure - 5,475 SF
Design
$1,095,000 CJ est. value
Hillsboro, TX 76645

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Post-Bid
$700,000 est. value
La Vernia, TX

National Chain Retail Store / Hillsboro
Demolition, Renovation, Infrastructure - 18,466 SF
Post-Bid
$600,000 CJ est. value
Hillsboro, TX 76645

SH 81 - Overlay
Infrastructure
Results
$2,727,202 est. value
TX

FM0308 - Base Failure Pavement Repair
Infrastructure
Results
$836,030 est. value
TX

Buc-ee's #59 / Hillsboro
New Construction, Infrastructure - 74,000 SF
Construction
$60,000,000 CJ est. value
Hillsboro, TX 76645

Buc-ee's #59 / Hillsboro
New Construction, Infrastructure - 74,000 SF
Construction
$60,000,000 CJ est. value
Hillsboro, TX 76645

OCI Solar Power / County of Hill
Infrastructure
Pending Verification
$150,000,000 CJ est. value
Hillsboro, TX 76645

IH 35 from FM 3002 to US 82 - 601CT0000002746 - Wichita Falls Department of Transportation
Infrastructure
Pending Verification
$19,792,734 CJ est. value
Hillsboro, TX 76645

New Agricultural Building - 2022 Bond - Abbott Independent School District
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Abbott, TX 76621

Quality Sheds / Itasca
New Construction, Infrastructure - 35,830 SF
Design
$2,000,000 CJ est. value
Itasca, TX 76055

Family Dollar #26839 / Whitney
Renovation - 10,844 SF
Post-Bid
$750,000 CJ est. value
Whitney, TX 76692

Last Updated 10/06/2023 11:54 AM
Project Title

Foxfury Lighting

Physical Address View project details and contacts
City, State (County) Hillsboro, TX 76645   (Hill County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Manufacturing and office facility. As of October 6, 2023, this project remains on hold pending owner review. The construction documents are complete. An architect has been selected; however, a general contractor or selection method is not disclosed. Although a firm timeline cannot currently be established, construction is not expected to commence prior to late-fourth quarter 2023.

Details

11,908 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents