Similar Projects
Walmart Supercenter #4274-276 - Smart Bundle
Renovation - 203,820 SF
Design

Walmart Supercenter #6958-220 - Smart Bundle
Renovation - 186,902 SF
Design
Cameron, NC

Multiple Schools - Additions / Renovations
Addition, Demolition, Renovation, Infrastructure - 51,869 SF
Bidding
$15,000,000 CJ est. value
Lillington, NC 27546

Sampson Bridge 169 Replacement
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Dunn, NC 28334

Walmart Supercenter #1237-607 - CAPX-COMBO
Renovation
Post-Bid
Dunn, NC

RFQ D/B - Neills Creek Park Concession and Restroom Facility
New Construction, Infrastructure
Post-Bid
$900,000 CJ est. value
Angier, NC 27501

Hwy 55 Burgers Shakes & Fries
New Construction - 2,949 SF
Construction
$500,000 to $1,000,000 CJ est. value
Dunn, NC 28334

Walmart Supercenter #1237-277 - CSP
Renovation - 206,347 SF
Construction
$399,770 est. value
Dunn, Erwin, NC 28339

Sanford Industrial Park
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Sanford, NC 27330

East Coast Logistics Park
New Construction, Infrastructure - 1,500,000 SF
Pending Verification
$805,000,000 CJ est. value
Dunn, NC 28334

Walmart Supercenter #1237-278 - D80 BLST CHIL
Renovation - 206,347 SF
Design
Dunn, Erwin, NC 28339

Harnett County Schools Central Office Renovation
Infrastructure, Renovation
Bidding
$900,000 CJ est. value
Lillington, NC 27546

Love's Travel Stop #412 / Dunn
New Construction, Infrastructure - 11,287 SF
Post-Bid
$3,500,000 CJ est. value
Dunn, NC 28334

Dupree Farms Subdivision
New Construction, Infrastructure
Design
$95,000,000 CJ est. value
Angier, NC 27501

Grading, Paving, Drainage and Pavement markings
Infrastructure
Bidding
$2,000,000 CJ est. value
Lillington, NC 27546

Last Updated 09/14/2022 01:36 PM
Project Title

Petco #5522 / Dunn

Physical Address View project details and contacts
City, State (County) Dunn, NC 28334   (Harnett County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Retail, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*The owner requests that all subcontractor / supplier inquiries be directed to the invited GC Bidders.

Details

1 Story Above Grade, 11,875 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents