Similar Projects
Salt River Schools Early Childhood Education Center (ECEC) Administration Entry Vestibule Addition
Addition
Post-Bid
Scottsdale, AZ 85256

Early Childhood Education Center (Ecec) Classroom & Parking Expansion And Renovations
Renovation, Addition - 10,000 SF
Post-Bid
$7,998,940 est. value
Scottsdale, AZ 85256

The Learning Experience
New Construction - 10,095 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Mesa, AZ 85205

Dogtopia
Renovation - 8,231 SF
Post-Bid
$900,000 est. value
Phoenix, AZ 85044

Dogtopia / Tempe
Demolition, Renovation - 6,455 SF
Post-Bid
$800,000 CJ est. value
Tempe, AZ 85282

59th Avenue and Dobbins Road Mixed-Use Development
New Construction, Infrastructure - 36,200 SF
Design
$11,000,000 CJ est. value
Phoenix, AZ 85339

RFP D/B - Design and Installation Services of a (1) Turn-Key Modular Building Larry C. Kennedy Elementary School
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Phoenix, AZ 85016

Lily's Pad Play Space / Tempe
New Construction, Infrastructure - 5,244 SF
Post-Bid
$1,000,000 CJ est. value
Tempe, AZ 85282

PYT Child Care Center
New Construction - 18,600 SF
Design
$1,500,000 est. value
Tucson, AZ

Amphitheater High School- Building H
New Construction
Design
Tucson, AZ 85705

Amphitheater High School Renovation 300 Wing
Renovation
Results
Tucson, AZ 85705

Pascua Yaqui Tribe (PYT) Early Learning Center
New Construction, Infrastructure
Results
$11,657,000 CJ est. value
Tucson, AZ 85757

The Learning Experience/Marana
New Construction, Infrastructure - 9,058 SF
Pending Verification
$1,947,470 CJ est. value
Tucson, AZ 85743

Last Updated 12/12/2022 02:35 PM
Project Title

DCCD Building Re-Leveling Services Department of Child Care and Development Navajo Nation Division of Social Services

Physical Address View project details and contacts
City, State (County) Window Rock, AZ 86515   (Apache County)
Category(s) Education
Sub-Category(s) Pre-School/Daycare
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Navajo Nation Department of Child Care and Development program's primary mission to provide quality childcare to the Navajo Nation communities. The purpose of providing childcare is to ensure that the family can become self-sufficient through employment or becoming employable in the near future. This can be done by employment, job training or through higher education. This is accomplished through the tribal childcare centers or private providers. The Navajo Nation Department of Child Care and Development solicits a licensed contractor to: The purpose of the scope of work is to define and establish the scope of services necessary and contract shall be awarded based on the lowest responsible bid and responsive bid package which, meets the needs of the Navajo Nation of Child Care and Development, to re-level modular buildings as required, at Alchini Nizhoni I Child Care Center -- Building No. 4244, Alchini Nizhoni II Child Care Center -- Building No. 4245, Cottonwood Child Care Center-- Building No. 4022, Cottonwood Child Care Center-- Building No. 4019, Hogback Child Care Center-Building No. 4010, Kii Doo Baa 11 Child Care Center -- Building No. 4011, Little Miss Muffet I Child Care Center --Building No. 4008, Little Miss Muffet II Child Care Center -- Building No. 4009, Many Farms Child Care Center--Building No. 4021, Pinon 11 Child Care Center-- Building No. 4246, Shonto Child Care Center-- Building No. 4016, Tsaile Child Care Center-- Building No. 4013, Tuba City I Child Care Center-- Building No. 4015, Tuba City II Child Care Center -- Building No. 4017 and Tuba City III Child Care Center -- Building No. 4020. Site Locations: 1. Alchini Nizhoni I Child Care Center, Building No. 4244 -- 4,368 square feet (S.F.) - Shiprock, New Mexico -- North side of Shiprock Dine College Campus 2. Alchini Nizhoni II Child Care Center, Building No. 4245 -- 6,720 S.F. - Shiprock, New Mexico -- North side of Shiprock Dine College Campus 3. Cottonwood Child Care Center, Building No. 4002 -- 3,593 S.F. - Cottonwood, Arizona - 1/4 mile west of Cottonwood Chapter House 4. Cottonwood Child Care Center, Building No. 4019 -- 3,593 S.F. - Cottonwood, Arizona -- % mile west of Cottonwood Chapter House 5. Hogback Child Care Center, Building No. 4010 -- 2,865 S.F. - Hogback, New Mexico -- north side of Flowing Water Navajo Casino, next to Hogback Chapter House 6. Kii Doo Baa II Child Care Center, Building No. 4011 -- 1,514 S.F. - Chinle, Arizona -- 1/4 mile east of Chinle High School campus 7. Little Miss Muffet I Child Care Center, Building No. 4008 -- 2,856 S.F. - Fort Defiance, Arizona -- 1/4. mile southwest from Fort Defiance Speedway gas station. 8. Little Miss Muffet II Child Care Center, Building No. 4009 -- 3,593 S.F. - Fort Defiance, Arizona -- VI mile southwest from Fort Defiance Speedway gas station 9. Many Farms Child Care Center, Building No. 4021 -- 4,365 S.F. - Many Farms, Arizona -- 1/4 mile west of Many Farms Chapter House 10. Pinon II Child Care Center, Building No. 4246 -- 13,000 S.F. - Pinon, Arizona -- 1/2 mile northwest side on Pinon Public School campus 11. Shonto Child Care Center, Building No. 4016 -- 2,652 S.F. -- Shonto, Arizona - south side, next to Shonto Head Start School 12. Tsaile Child Care Center, Building No. 4013 -- 2,952 S.F. - Tsaile, Arizona -- 1/4 mile west side of Tsaile Dine College Campus 13. Tuba City I Child Care Center, Building No. 4015 -- 1,296 S.F. - Tuba City, Arizona -- south Tuba City, east of Navajo Veteran Office 14. Tuba City II Child Care Center, Building No. 4017 -- 1,859 S.F. - Tuba City, Arizona -- south Tuba City, east of Navajo Veteran Office 15. Tuba City Ill Child Care Center, Building No. 4020 -- 1,680 S.F. - Tuba City, Arizona -- south Tuba City, east of Navajo Veteran Office All analysis, re-level of modular buildings and inspection work on site shall be coordinated and scheduled for the following buildings: Alchini Nizhoni I Child Care Center -- Building No. 4244, Alchini Nizhoni II Child Care Center -- Building No. 4245, Cottonwood Child Care Center Building No. 4022, Cottonwood Child Care Center -- Building No. 4019, Hogback Child Care Center- Building No. 4010, Kii Doo Baa II Child Care Center -- Building No. 4011, Little Miss Muffet I Child Care Center -- Building No. 4008, Little Miss Muffet II Child Care Center --Building No. 4009, Many Farms Child Care Center -- Building No. 4021, Pinon II Child Care Center --Building No. 4246, Shonto Child Care Center -- Building No. 4016, Tsaile Child Care Center -- Building No. 4013, Tuba City I Child Care Center Building No. 4015, Tuba City II Child Care Center Building No. 4017 and Tuba City III Child Care Center -- Building No. 4020. The contractor shall provide a schedule to complete the scope of work within 45 calendar days.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents