Similar Projects
AE Burdick K-8 School - Office Remodeling
Renovation
Bidding
Milwaukee, WI 53207

Clintonville Public School District Additions And Remodeling - Bid Package #2
Renovation, Addition
Bidding
Clintonville, WI

Parkside Elementary School Bid Package 1
Renovation, Addition
Post-Bid
Fond du Lac, WI 54935

Parkside Elementary School Bid #2
Renovation, Addition
Post-Bid
Fond du Lac, WI 54935

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Stateline Boys and Girls Club
New Construction, Renovation - 22,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

Stateline Boys and Girls Club
New Construction, Renovation - 22,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

Alexander Mitchell Elementary School - Library and Reading Area Improvements
New Construction
Bidding
Milwaukee, WI 53204

Roberts Elementary School Interior Remodeling and Renovations
Renovation
Post-Bid
Fond du Lac, WI 54935

Hamilton Elementary
Renovation, Addition - 18,000 SF
Results
La Crosse, WI 54601

Evans Elementary School Interior Remodeling and Renovations
Renovation
Post-Bid
Fond du Lac, WI 54935

2021 Elementary School Renovation
Renovation
Results
New Holstein, WI 53061

Hatley Elementary School Renovation
Renovation
Post-Bid
Hatley, WI 54440

Milwaukee Parkside School Of The Arts - Energy Conservation Building System Upgrades
Renovation
Results
Milwaukee, WI 53207

Last Updated 06/23/2021 12:15 PM
Project Title

ADA Accessible Elevator Addition - GPC

Physical Address View project details and contacts
City, State (County) Delavan, WI 53115   (Walworth County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $520,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of constructing a new (3) stop elevator addition adjacent to the existing stairway area of Pie Hall on the School for the Deaf campus. The new elevator will provide an internal accessible path for wheelchairs between the primary school and other campus buildings. Currently, wheelchair students must traverse an outdoor sidewalk to access campus buildings including food services and the health center. A new stairway addition, adjacent to the new elevator shaft and meeting current building code guidelines, will be constructed to connect the upper and lower levels of Pie Hall with the intermediate ground level. Site, mechanical, electrical, and plumbing are also part of the project scope

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents