Similar Projects
Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

Main Tank #4 Construction - City of Kingman
Infrastructure
Conception
$500,000 est. value
Kingman, AZ

US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 1 - Arizona Department of Transportation (AZDOT)
Infrastructure
Design
$70,000,000 CJ est. value
Kingman, AZ 86401

Ramar Road Drainage Improvements - City of Bullhead City
Infrastructure
Design
$1,050,000 CJ est. value
Bullhead City, AZ 86442

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Construction Manager at Risk - Construction Manager at Risk (CMAR) - AMTC - Advanced Manufacturing Training Center
New Construction, Infrastructure - 30,000 SF
Bidding
$12,500,000 CJ est. value
Kingman, AZ 86401

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

RFP D/B - Two Single-family Homes in Peach Springs
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Peach Springs, AZ 86434

World-Wide Water Storage Tank Remediation
Term Contract
Results

Pefo Replace Water Tank Ladder
Results

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

Trails at Black Mountain
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Bullhead City, AZ 86442

Hilltop Plant Stairs Screens Replacement - City Of Kingman
Alteration
Conception
$500,000 est. value
Kingman, AZ 86401

AutoZone # 5301 / Pomona
New Construction, Infrastructure - 6,800 SF
Design
$1,500,000 CJ est. value
Bullhead City, AZ 86442

AutoZone #5704 / Lake Havasu City
New Construction, Infrastructure - 6,446 SF
Bidding
$1,500,000 CJ est. value
Lake Havasu City, AZ 86404

Last Updated 02/20/2023 01:09 PM
Project Title

Lakeside Line Replacement - City of Bullhead City

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ 86429   (Mohave County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the design and construction of a variety of miscellaneous sewer improvements and repairs of the remaining ductile iron pipe (DIP) and associated manholes, vaults and borings within city limits. A variety of improvements have been undertaken over the years including upsizing of sewer mains, repair of pipe and manholes, and the pump out and abandonment of septic tanks and other vaults. These improvements and repairs protect the environment and the public health by upsizing sewer facilities to eliminate surcharging and corrosion of manholes. This in turn lowers operating costs and efforts by reducing sewer plugging, reducing wastewater treatment operations, and improving energy efficiency. As of August 17, 2022, this project is currently in the City of Bullhead City's FY 2022-2027 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents