Similar Projects
Northern Valley Law Enforcement Memorial
New Construction
Conception
$250,000 est. value
Grand Forks, ND 58201

RFP Engineering - Burnt Creek River Crossing Within 28th Street NW Project
Infrastructure
Conception
$200,000 CJ est. value
Hay Creek, ND 58503

Southwest Pipeline Project | Hydraulic Improvements in the Fairfield, Killdeer Mountain, New Hradec, and Twin Buttes Service Areas
Infrastructure
Bidding
$2,500,000 CJ est. value
Bismarck, ND 58501

NAWS (Northwest Area Water Supply) Pipeline Project, Contract 2-4D
Infrastructure, Renovation
Bidding
$712,562 CJ est. value
Westhope, ND 58793

Tennis Courts Reconstruction
Post-Bid
$680,000 to $910,000 est. value
Valley City, ND 58072

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Playground Equipment
Results
Bismarck, ND 58503

Unit 1 - Sertoma Park Improvements
Results
$210,000 to $280,000 est. value
Bismarck, ND 58504

International Peace Gardens - Campus Upgrades
Infrastructure
Pending Verification
$500,000 CJ est. value
Dunseith, ND 58329

International Peace Gardens - Campus Upgrades
Infrastructure
Pending Verification
$500,000 CJ est. value
Dunseith, ND 58329

Reconstruction of 43rd Avenue NE (US 83 to 26th Street and 19th Street)
Infrastructure
Conception
$17,280,000 CJ est. value
Bismarck, ND 58503

Clearing and Grubbing
Infrastructure
Bidding
$60,000 CJ est. value
Napoleon, ND 58561

Promontory Point Park
New Construction
Post-Bid
$416,140 est. value
Bismarck, ND

Unit 2 - Sleepy Hollow Park Improvement
Results
$158,000 to $211,000 est. value
Bismarck, ND 58501

Highway 11/18 Improvements - North Dakota Department of Transportation
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Lidgerwood, ND 58053

Last Updated 11/01/2022 11:01 AM
Project Title

Grafton Athletics - Track and Field

Physical Address View project details and contacts
City, State (County) Grafton, ND 58237   (Walsh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,887,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 1, 2022, the project is pending award. A timeline for award has not been confirmed. Sand Base - 5,435 Tons; 6" Class 5 Aggregate Base - 2,016 Tons; 4" Asphalt Pavement - 1,031 Tons; 5" Reinforced Concrete Pavement - 993 SY; ACO Perimeter Drain - 1300 LF; ACO Inline Catch Basin - 10 EA; 8" Perforated Pipe - 296 LF; 10" Perforated Pipe - 582 LF; 12" Perforated Pipe - 352 LF; Other miscellaneous items and incidentals. Please contact us at 701-232-5353 if you have any questions.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents