Similar Projects
STEM Building B - Seminole State College
New Construction, Infrastructure - 111,775 SF
Conception
$48,564,418 CJ est. value
Altamonte Springs, FL 32714

3000 Celery
New Construction, Infrastructure
Conception
$5,000,000 est. value
Sanford, FL 32771

Black Rifle Coffee Co.
New Construction - 2,654 SF
Design
Oviedo, FL 32765

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Chipotle / Winter Springs
New Construction - 2,428 SF
Post-Bid
$378,000 CJ est. value
Winter Springs, FL 32708

Construction of Sunrail Station Bicycle and Pedestrian Connectivity Improvements
Infrastructure
Post-Bid
$8,900,000 est. value
Altamonte Springs, FL

Silicone Joint Sealer
Infrastructure
Results

Evaluation of Enhanced-Friction Asphalt Overlays and Surface Treatments
Infrastructure
Results

Chick-fil-A #0581
New Construction - 4,838 SF
Construction
$850,000 to $950,000 est. value
Winter Springs, FL 32708

Food Factory
New Construction - 14,000 SF
Construction
$2,200,000 est. value
Oviedo, FL 32765

Kentucky Square
New Construction, Infrastructure
Pending Verification
$58,300,000 CJ est. value
Sanford, FL 32773

Kentucky Square
New Construction, Infrastructure
Pending Verification
$58,300,000 CJ est. value
Sanford, FL 32773

QSR Coffee Shop
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Sanford, FL 32771

Yarborough Ranch
New Construction, Infrastructure
Design
$117,000,000 CJ est. value
Geneva, FL 32732

Harvest Time International / Sanford
New Construction, Infrastructure - 30,092 SF
Post-Bid
$10,000,000 CJ est. value
Sanford, FL 32771

Last Updated 02/14/2024 05:33 PM
Project Title

Chick-fil-A #05401 / Sanford

Physical Address View project details and contacts
City, State (County) Sanford, FL 32771   (Seminole County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $1,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a restaurant with a drive-through lane on 5.02 acres on the southwest corner of the intersection. As of February 14, 2024, a building permit has been applied for, but not issued. A general contractor has not been announced. Construction may begin late spring 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 4,932 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents