Similar Projects
Rockwell Creek Industrial Park
New Construction
Design
$6,000,000 est. value
Oklahoma City, OK 73127

Pryor Distribution Doors Furnish and Install
Renovation
Sub-Bidding
$40,000 CJ est. value
Pryor, OK 74361

Exotic Motorsports of Oklahoma Buildings 1 and 2
New Construction - 21,000 SF
Design
$2,800,000 est. value
Edmond, OK 73013

The Oaks
New Construction
Conception
$10,000,000 est. value
Oklahoma City, OK 73131

LTR Fasteners at Aeroflex 2 / Tulsa
Renovation
Pending Verification
$2,134,231 CJ est. value
Tulsa, OK 74116

Lincoln Industrial Park
New Construction
Pending Verification
Edmond, OK 73013

15th Street Warehouse And Distribution Center
New Construction - 517,220 SF
Construction
$10,000,000 CJ est. value
Oklahoma City, OK 73128

Industrial Warehouse
New Construction
Conception
Oklahoma City, OK 73105

USA Rare Earth Manufacturing Facility
Renovation - 309,600 SF
Conception
$100,000,000 est. value
Stillwater, OK 74075

Ottawa County Fuel Management System
Renovation
Bidding
$40,000 CJ est. value
Fairland, OK 74343

Henshaw Industrial Park
New Construction
Pending Verification
Broken Arrow, OK 74012

Lawton Fort Sill Airport Industrial Park Phase 2
New Construction
Conception
Lawton, OK 73501

Last Updated 07/28/2022 12:02 PM
Project Title

Hawthorne Gardening Company High Piled Storage Racking Phase 2 / Tulsa

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74134   (Tulsa County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $774,753 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a storage system at a distribution facility. As of July 28, 2022, this project has obtained building permits. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

8,182 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents