Similar Projects
Lift Bridge PLC Services
Term Contract
Post-Bid
Concord, NH 03302

Electrical Inspection, Maintenance and Repair for Bridges
Post-Bid
Concord, NH 03302

Roadway Resurfacing
Results
Less than $8,270,829 est. value
Bedford, Concord, Hooksett, Merrimack, Nashua, NH 03060

2020 Paving, Reclamation, and Cold Planing
Results
Allenstown, NH

Crack Sealing and Crack Repair
Post-Bid
Less than $10,000 est. value
Bow, NH

Crack Sealing 2020
Results
Henniker, NH 03242

Seal Coating and Drain Repair
Post-Bid
Chichester, NH 03275

Paving and Reclaiming 2020
Results
Henniker, NH

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Center Hill Road over Little Suncook River Bridge Deck Rehabilitation
Results
Epsom, NH

Adaptive Reuse of Danbury Bridge
New Construction
Post-Bid
Danbury, NH

Fabricated Steel Bridge Frames
Results
Concord, NH

Washington Street Bridge Rehabilitation Project
Results
$675,000 to $725,000 est. value
Concord, NH

Resurfacing Us 202 in Hillsborough and Henniker including the Ramps at NH 114
Results
Less than $4,151,514 est. value
Henniker, Hillsborough, Hopkinton, NH 03242

Address Preservation Needs on 5 Bridges in Hooksett and Manchester and over I-93 SB
Results
Less than $8,928,952 est. value
Hooksett, Manchester, NH 03106

Last Updated 11/04/2021 05:55 PM
Project Title

Pavement Rehabilitation on I-89, Roadway Work, Rest Area Reconstruction and Additional Work including Rwis Installation and Bridge Preservation

Physical Address View project details and contacts
City, State (County) New London, Sutton, NH   (Merrimack County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $31,400,021
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Consists Of Pavement Rehabilitation On i-89 Nb And Sb; Roadway Work, Rest Area Reconstruction And Additional Work Including Rwis Installation And Bridge Preservation

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents