Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

The Magnolias
New Construction, Infrastructure - 89,800 SF
Design
$24,900,000 CJ est. value
Morgan Hill, CA 95037

Cold Plane AC, Paving with RHMA, Upgrade Median CB and Curb Ramp
Infrastructure
Bidding
$51,000,000 CJ est. value
San Jose, CA 95110

Monterey Road Guardrail Project Re-Bid
Infrastructure
Sub-Bidding
$1,783,550 CJ est. value
San Jose, CA 95138

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Fisher Basin Expansion Project
Infrastructure
Results
$1,450,000 CJ est. value
Morgan Hill, CA 95037

Combination Pressure Reducing and Pressure Sustaining Valves
Term Contract
Results
Santa Clara, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Kifer Senior Housing
New Construction, Infrastructure
Construction
$13,500,000 CJ est. value
Santa Clara, CA 95051

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Last Updated 01/24/2023 04:21 PM
Project Title

SCWP - Secondary Treatment and Thickening/Dewatering - CAS Stage 1

Physical Address View project details and contacts
City, State (County) Sunnyvale, CA 94089   (Santa Clara County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $250,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, and equipment and performing all work necessary and incidental to the completion of the Project known as "SCWP - Secondary Treatment and Thickening/Dewatering - CAS Stage 1, Project No. UY-21-07" demolition of existing utilities, improvements to the existing digested sludge supernatant pump station, construction of bioreactors, blower building, secondary clarifiers, RAS/WAS pump station, thickening and dewatering building, digested sludge storage tank, thickened sludge storage tank, sidestream treatment system, standby generator and fuel tank, yard piping within the Water Pollution Control Plant boundaries, site work, existing facility modification/demolition, electrical/instrumentation/control system improvements, and related systems and facilities according to Plans and Specifications prepared by the City of Sunnyvale and according to the Bid Documents. This package can be downloaded from DemandStar Corporation on our website. Project Estimated Budget 250,000,000.00. All prospective bidders/respondents are hereby cautioned not to contact any member of the city of sunnyvale staff or officials other than the specified contact person. Minority-owned, woman-owned, and small business enterprises are encouraged to respond to this solicitation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents