Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 715/ 611 Intersection
Infrastructure
Design
$9,330,537 CJ est. value
Henryville, PA 18332

SR 715/ 611 Intersection
Infrastructure
Design
$9,330,537 CJ est. value
Henryville, PA 18332

SR 0115 Effort Corridor Improvements
Infrastructure
Bidding
$7,500,000 CJ est. value
Effort, PA 18330

SR 0115 Effort Corridor Improvements
Infrastructure
Bidding
$7,500,000 CJ est. value
Effort, PA 18330

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

PMREMS Building Expansion and Renovation - Rebid
Addition, Demolition, Renovation, Infrastructure - 4,041 SF
Post-Bid
$2,484,000 CJ est. value
Tobyhanna, PA 18466

Northgate Elevated Water Storage Tank Rehabilitation Project
Renovation, Infrastructure
Results
$525,200 CJ est. value
Stroudsburg, PA 18360

Thomas Street Paving and ADA Ramp Project
Infrastructure
Results
$100,000 to $200,000 est. value
Stroudsburg, PA 18360

North Ninth Convenience Store
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Stroudsburg, PA 18360

Black Buffalo 3D Corporation
Demolition, New Construction, Infrastructure - 131,250 SF
Pending Verification
$35,700,000 CJ est. value
Smithfield Township, PA 18301

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 715 over Pocono Creek
Demolition, New Construction, Infrastructure
Design
$3,855,006 CJ est. value
Henryville, PA 18332

Monroe Career and Technical Institute Conference Center Addition
Addition, New Construction, Infrastructure
Bidding
$155,000 CJ est. value
Stroud Township, PA 18321

Last Updated 10/18/2023 05:07 AM
Project Title

RFP D/B - SR 209 Milford Rd to Municipal Dr Road Resurfacing

Physical Address View project details and contacts
City, State (County) Smithfield Township, PA 18301   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Partial Design Build Resurfacing Project Involves Asphalt Milling, Asphalt Overlay, Base Repair, Design/build Ada Curb Ramp Upgrade, Guide Rail Upgrade, Pavement Markings Upgrade, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 209, Section 30m, in Monroe County, Smithfield and Middle Smithfield Townships, From Approximately Segment 0492 Offset 1000 to Approximately Segment 0560 Offset 0100. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - RFP D/B - SR 209 Milford Rd to Municipal Dr Road Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project is for the improvement of SR 209 located in Monroe County, Smithfield and Middle Smithfield Townships from Segment 0492/1000 to Segment 0560/0100 for a construction distance of 2.33 miles (12,302 LF). The project involves the resurfacing of SR 209 using the following items: asphalt milling, an asphalt overlay, base repair, pavement markings upgrade, guide rail upgrade, ADA ramp upgrade, and other miscellaneous items. All work is within the existing right-of-way and is 100% federally funded. This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents