Similar Projects
Evolve Biologics Manufacturing Facility
New Construction
Conception

Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

SOFTBALL FIELD UPGRADE
Infrastructure
Design
$300,000 CJ est. value
San Antonio, TX 78224

2018 Street Bond Projects - Phase II
Infrastructure
Bidding
$1,900,000 est. value
Kirby, TX

4G Cancer Center Audie L. Murphy VAMC
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
San Antonio, TX 78229

Children's Eye Center of South Texas / Medical Office Building
Addition, Demolition, Renovation, Infrastructure - 12,011 SF
Sub-Bidding
$2,325,000 CJ est. value
San Antonio, TX 78258

Borchers Drive Reconstruction from Deer Grove Drive to Ackerman Road
Infrastructure
Post-Bid
$545,000 est. value
Kirby, TX 78219

Final Cleaning, Signage, Wall Graphics, Landscaping and Unit Paving
Infrastructure, Alteration
Post-Bid
San Antonio, TX 78204

VMC Asphalt Parking Lots Improvements
Results
San Antonio, TX 78212

Somerset K - Street Phase II Reconstruction
Results
$268,298 est. value
Somerset, TX 78069

Amazon Remodel Project UTX8
Demolition, New Construction, Infrastructure - 10,130 SF
Pending Verification
$1,695,000 CJ est. value
San Antonio, TX 78218

Amazon Remodel Project UTX8
Demolition, New Construction, Infrastructure - 10,130 SF
Pending Verification
$1,695,000 CJ est. value
San Antonio, TX 78218

CNG Head Quarters / CNG Office Building
Renovation, Infrastructure
Design
$2,400,000 est. value
San Antonio, TX

Steven M. Clouse WRC Electrical System Improvements - Phase 2B
New Construction, Renovation, Infrastructure
Bidding
$17,000,000 CJ est. value
San Antonio, TX 78221

Last Updated 08/15/2022 10:34 AM
Project Title

Cornerstone Commerce Center

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78219   (Bexar County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $32,067,840 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans consist of new construction of two shell buildings with one white box finish out in each building. Sitework includes sidewalks, curb ramps, and parking areas. As of July 2022, construction has commenced.

Details

413,173 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents