Similar Projects
The Yards Parcel L
New Construction - 292,475 SF
Conception
Washington, DC 20003

Skyland Town Center Phase II
New Construction - 503,600 SF
Conception
$10,000,000 CJ est. value
Washington, DC 20020

Rhode Island Shopping Center Phase I
New Construction - 72,250 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20002

Meridian International Redevelopment
New Construction - 9,266 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20009

The Grove at Parkside - Parcel 11
New Construction
Sub-Bidding
$42,400,000 est. value
Washington, DC 20019

4620 Wisconsin Avenue Northwest
New Construction, Renovation, Demolition - 12,000 SF
Post-Bid
Washington, DC 20016

Spring Flats Apartments
New Construction
Post-Bid
Washington, DC 20010

X--Charleston, SC 75,000 Net Usable Square Feet of Medical Clinic Lease Space Market Survey Notice
Results
Washington, DC 20001

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

300 M
New Construction - 414,118 SF
Construction
$90,000,000 est. value
Washington, DC 20002

900 New York Avenue
New Construction - 836,000 SF
Construction
$10,000,000 CJ est. value
Washington, DC 20001

Parcel 15 - St. Elizabeth East
New Construction - 250,000 SF
Pending Verification
$218,600,000 est. value
Washington, DC 20032

I-695 Development
New Construction - 615,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Washington, DC

Howard University Trauma Center
New Construction, Demolition
Conception
Washington, DC

Assisted Living Facility
New Construction
Design
Washington, DC 20016

Reported 09/05/2019 12:00 AM
Project Title

Project Management Services Redevelopment of St. Elizabeths East Campus

Physical Address View project details and contacts
City, State (County) Washington, DC   (District of Columbia County)
Category(s) Heavy and Highway, Medical, Residential
Sub-Category(s) Hospital, Medical Office/Outpatient, Parking Garage, Residential Shelter
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Program Manager (“PM” or “Contractor”) to provide professional program management support services to assist the District in the planning, design-management, construction-management and control, commissioning, and occupancy of the Project. The Master Project (Project) consists of the following phases: (a) Phase One A: New St. Elizabeths East Men’s Shelter at Parcel 2 (b) Phase One B: Existing St. Elizabeth East Horse Stable/Barn Stabilization at Parcel 1 (c) Phase Two: Parking Garage at Parcel 6 (d) Phase Three A: Campus Microgrid System (e) Phase Three B: Pecan Street Infrastructure (f) Phase Four B: New Hospital Water Service (g) Phase Five: Demolition of Existing 801 East Men’s Shelter at Parcel 2 (h) Phase Six: New Hospital Sitework/Ambulatory Pavilion and Offices at Parcel 2 (i) Phase Seven A: New Hospital Tower and Main Building at Parcel 2 (j) Phase Seven B: New Hospital Parking Garage at Parcel 2 (k) Phase Eight A: 13th Street Remaining Infrastructure Phases One A, Six, and Seven A and B are not part of the PM’s scope of work but are provided for reference.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving, Protective Covers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Mercantile and Service Equipment, Vending Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Art, Window Treatments, Window Blinds, Casework, Furnishings and Accessories, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents