Similar Projects
Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Design
$1,000,000 to $5,000,000 est. value
FL

Drainage
Bidding
Less than $250,000 est. value
FL

Drainage Improvements
Bidding
Less than $200,000 est. value
FL

Historic Miramar Drainage System Improvements Phase V
Post-Bid
$400,000 to $550,000 est. value
Miramar, FL 33025

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Historic Miramar Drainage System Improvements, Phase IV
Results
Miramar, FL

Flood Control and Coastal Emergency Beach Erosion Control Project Broward County, Florida - Broward County Segment III
Results
$5,000,000 to $10,000,000 est. value
Dania, Hallandale, Hollywood, FL

Interchange/Modification/Bridge Widening/Drainage Improvements/Milling and Resurfacing
Bidding
Less than $27,583,008 est. value
FL

Shore Protection Project, Segment II, Beach Renourishment 2020-2021, Broward County, Florida
Post-Bid
$25,000,000 to $35,000,000 est. value
FL

SBDD Stormwater Culvert Slip-Lining Project
Results
Southwest Ranches, FL

N-29A Canal Connector Project
Results
Less than $1,050,000 est. value
Fort Lauderdale, FL

Segment II Nearshore Hardbottom Mitigation
Results
Less than $6,075,000 est. value
FL

Recreational Artificial Reef Project
Results
Less than $234,625 est. value
Deerfield Beach, FL

North East 30 Avenue Drainage Improvements
Results
Less than $141,856 est. value
Lighthouse Point, FL

Sunrise Lakes Drive North Drainage Improvements
Results
Sunrise, FL

Last Updated 03/08/2019 08:05 AM
Project Title

Canal Bank Repair

Physical Address View project details and contacts
City, State (County) North Lauderdale, FL   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Installing steel sheet piles supported by concrete cap and concrete batter piles in conformance with the contract drawings and documents. Work includes, but is not limited to: 1. Removing and lawfully disposing of vegetation, clearing and preparing site for construction. 2. All backfilling with required compaction, grading and sod installation. 3. Restoring the site, and repairing any damaged items not in the contract to their original or better conditions.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents