Similar Projects
Bridgeview Courthouse Tenant Improvements
Alteration
Post-Bid
Bridgeview, IL 60455

Removal and Replacement of Monoglass Insulation
Alteration
Post-Bid
Rosemont, IL

Stair Improvements at Elgin High School
Alteration
Results
Elgin, IL 60120

GSA - DOS Carpet and Paint at JCK Federal Building
Renovation, Term Contract
Results
Chicago, IL 60604

County Building Facade Inspection
Infrastructure, Alteration
Post-Bid
Chicago, IL

Hattie Callner Interior
Renovation, Alteration - 90,762 SF
Results
Chicago, IL 60657

Structural Support Repair
Alteration
Post-Bid
Morton Grove, IL

Water Treatment Plant Pipe Gallery Staircase Replacement
Alteration
Results
Chicago, Western Springs, IL 60558

Interior Waste Bins Installation
Alteration
Post-Bid
South Holland, IL 60473

Vivian Gordan Harsh Apartment Interior
Renovation, Alteration
Results
Chicago, IL 60653

APMS Casework
Alteration
Post-Bid
Oak Forest, IL 60452

Vivian Carter Apartments Interior Renovation
Renovation, Alteration
Results
$250,000 est. value
Chicago, IL 60621

Kennedy ES Courtyard and Lincoln MS Curtainwall Replacement
Alteration
Post-Bid
Schiller Park, IL 60176

METRA Station Retractable Wall Design and Installation
Alteration
Results
Oak Park, IL 60301

Insulation Removal and Minor Demo
Demolition, Alteration
Post-Bid
Chicago, IL

Last Updated 01/10/2023 10:38 AM
Project Title

Auditorium Renovation Work at Thornton Fractional North High School and Thornton Fractional South High School

Physical Address View project details and contacts
City, State (County) Calumet City, IL 60409   (Cook County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $1,162,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Work will be let under one general construction contract, to the lowest responsible bidder. Contractors desiring to obtain plans are required to register with the Architect, complete a bidder information form, and provide a A.I.A. Document A-305 (Contractor Qualification Statement), prepared for this specific project. Each bid must be accompanied by a bid bond, or a certified check payable to the order of the Owner, certified by a responsible bank for an amount not less than 10% of the total amount of the bid, as a guarantee that the bidder, if awarded the Contract, will furnish a satisfactory performance and payment bond, execute the Contract and proceed with the work. A 100% Performance Bond and a Labor/Material Bond will be required of the successful bidder, written by a Surety approved by the Owner. No bid will be considered unless the bidder shall furnish evidence satisfactory to the Owner that he has the necessary facilities, abilities, experience, equipment and financial and physical resources available to fulfill the conditions of the Contract and execute the work, should the Contract be awarded to him. Not less than the prevailing wage shall be paid for labor on the work to be done as required by law. The Board of Education, Thornton Fractional Township High School District 215 reserves the right to accept or reject any or all bids, waive any or all irregularities or technicalities in the bid, and award the bid in the manner that best serves the interests of the Owner.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents