Similar Projects
Camp Dodge Training Area Bridge Replacement
Renovation
Post-Bid
Johnston, IA

Lock and Dam
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Le Claire, IA

West Des Moines Digital Enterprise Segment 5-3 Raccoon River Crossing
New Construction
Results
West Des Moines, IA

J Street SW Bridge Over Prairie Creek Repairs
New Construction
Results
$25,000 est. value
Cedar Rapids, IA 52404

Bridge Replacement with Twin RCB - BR 1270
New Construction
Results
Less than $375,000 est. value
Polk City, IA

2021 Bridge Repair
Renovation, Infrastructure
Results
Webster City, IA 50595

Booneville Road Bridge Over Johnson Creek
New Construction
Results
$1,461,000 est. value
West Des Moines, IA 50266

Bridge Repair
New Construction, Infrastructure
Results
IA

Bridge Replacement - PPCB
New Construction, Infrastructure
Results
IA

Bridge Replacement - PPCB
New Construction, Infrastructure
Results
IA

Bridge Replacement - CCS
New Construction, Infrastructure
Results
IA

Bridge Replacement - CCS
New Construction, Infrastructure
Results
IA

Bridge Repair
New Construction, Infrastructure
Results
IA

Bridge Replacement - CCS
New Construction, Infrastructure
Results
IA

Bridge Approach Repair
New Construction, Infrastructure
Results
IA

Last Updated 11/02/2022 12:37 PM
Project Title

Utah Ave Bridge over Duck Creek Replacement - FP008 - City of Davenport

Physical Address View project details and contacts
City, State (County) Clearfield, IA 50840   (Taylor County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2027
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace the bridge on Utah Avenue over Duck Creek. The project is included in the city's 2023-2028 Capital Improvement Program (CIP). As of November 2, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents