Similar Projects
Asphalt Repair and Concrete Addition
Bidding
$17,000 est. value
Sumter, SC 29153

Airport Surveillance Radar Relocation
New Construction, Alteration
Bidding
North Charleston, SC

Rehabilitation- S-46 S-50 S-892
Post-Bid
SC

Shoulder Improvement - US 78
Post-Bid
SC

Marion County Inaccessible Roads
Results
Less than $125,202 est. value
Marion, SC

Intersection Improvements - S-485 and S-408
Results
SC

Waterway Elementary - New Parent Loop Road
Infrastructure
Bidding
Little River, SC 29566

Reconstruction/Rehabilitation - Pickens Co
Post-Bid
SC

Rehabilitation - Abbeville County
Results
SC

Check Valve Installation Project - SCPA Union Pier Terminal
Infrastructure
Bidding
Charleston, SC 29401

Reconstruction - District 2
Post-Bid

Corridor Improvement - SC 118 (Hitchcock Parkway)
Results
SC

CPST III Resurfacing Project District 9
Infrastructure
Bidding
$450,000 est. value
Florence, SC

Paving of Two (2) Concrete Parking Pads
Post-Bid
Cross Hill, SC

KC Ranch/Kershaw Road Improvement Project
Results
Kershaw, SC

Last Updated 04/21/2022 07:07 AM
Project Title

Reconstruction/Rehabilitation

Physical Address View project details and contacts
City, State (County) SC   (Orangeburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Traffic Control 1.000 Ls Railroad Insurance and Flagging 001 1.000 Ls Removal & Disposal of Existing Pavement 732.000 Sy Removal & Disposal of Existing Curb 835.000 Lf Unclassified Excavation 440.000 Cy Borrow Excavation 2,459.000 Cy Excavation for Shoulder Paving 460.804 Sta Hauling of Excavated Shoulder Material 460.804 Sta Cement Modified Recycled Base (10" Unif)-curing Method B 50,930.000 Sy Cement Modified Recycled Base (12" Unif)-curing Method B 53,935.000 Sy Portland Cement for Cement Modified Recycled Base Course 3,500.000 Ton Maintenance Stone 75.350 Ton Hma Shoulder Widening Course 3,072.360 Ton Liquid Asphalt Binder Pg64-22 2,521.543 Ton Full Depth Asph. Pav. Patching 8" Unif 7,535.000 Sy Milling Existing Asphalt Pavement 1.75" 37,290.000 Sy Milling Existing Asphalt Pavement 2.0" 120,550.000 Sy Milling Existing Asphalt Pavement 4.0" 66,330.000 Sy Milling Existing Asphalt Pavement (Variable) 18,030.000 Sy Milled-in Rumble Strip 18.430 Mi Hot Mix Asphalt Intermediate Course Type B 8,288.866 Ton Hot Mix Asphalt Surface Course Type B 26,139.449 Ton Hot Mix Asphalt Surface Course Type C 6,351.917 Ton Hot Mix Asphalt Surface Course Type D 624.000 Ton Driveway Paving-surface Type D 658.125 Ton Permanent Construction Signs (Ground Mounted) 4,520.000 Sf 4" White Broken Lines(Gaps Excl.)perm.pvmt.marking 3,552.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.pvmt.marking 137,665.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Perm.pvmt.marking 40.000 Lf 8" White Solid Lines Perm.pvmt.markings 2,085.000 Lf 12in X 18in White Triang. Yield Bar (Gaps Exc)perm.pvmt.mark 84.000 Lf 24" White Solid Lines (Stop/diag Lines)-perm.pvmt.marking 2,867.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.pvmt.marking 43.000 Ea White Word Message "Only" -perm.pvmt.marking 10.000 Ea White Combination Arrows(Str&rt.or Str<)perm.pvmt.marking 13.000 Ea Railroad Crossing Symbols - Perm.pvmt.marking 9.000 Ea Handicap Symbol - Perm.pvmt Marking 4.000 Ea 4" Yellow Broken Lines(Gaps Exc)perm.pvmt.marking 11,330.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Perm.pvmt.marking 106,855.000 Lf 24" Yellow Solid Lines - Perm.pvmt.marking 130.000 Lf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 7,449.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 381,325.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 4,330.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 5,885.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 74.000 Ea White Word Message "Only"-fast Dry Paint 20.000 Ea White Combination Arrow(Str.& Rt.or Str.& Lt.)fast Dry Paint 18.000 Ea Railroad Crossing Symbols - Fast Dry Paint 20.000 Ea Handicap Symbol - Fast Dry Paint 8.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 31,160.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 273,545.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 3,295.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 260.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 550.000 Lf 4"Yellow Solid Lines-pvt.edge&no Passing Zone - Epoxy Paint 1,100.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 310.000 Ea Permanent Yellow Pavement Markers Mono-dir.- 4"X 4" Perm. Yel. 102.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 1,689.000 Ea Perm.red/clear Pavement Markers Bi-dir. - 4"X 4" 45.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 610.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 16,210.000 Lf Sawcut for Loop Detector 5,570.000 Lf Concrete Curb and Gutter(1'-6") Vertical Face 85.000 Lf Concrete Curb and Gutter(2'-0") Vertical Face 270.000 Lf Concrete Curb and Gutter (3'-0") Vertical Face 480.000 Lf Concrete Sidewalk(4" Uniform) 7.000 Sy Detectable Warning Material 362.500 Sf Pedestrian Ramp Construction 725.000 Sy Surface Applied Detectable Warning 640.000 Sf Rip-rap (Class B) 15.000 Ton Geotextile for Erosion Control Under Riprap(Class 2)type C 20.000 Sy Remove & Dispose Semi-rigid Gr Device 1,520.000 Lf Premash W-beam Strong Post System Wsp3 300.000 Lf Mt3 Leading End Treatment Tl3 10.000 Ea Mb Trailing End Treatment 2.000 Ea Mgs3 Gr Standard Shoulder 550.000 Lf Premash Thriebeam Bridge Conn Tbbc3 4.000 Ea Mtbbc3 Mash Thrie-beam Barrier Connector Tl3 4.000 Ea Premash Type T Tl3 Leading 50' 4.000 Ea Permanent Grassing for Non-permitted Resurfacing Projects 12.590 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents