Similar Projects
Non-Potable Reservoir Pump Station
Post-Bid
Brighton, CO 80601

Marcy Gulch Lift Station Project
New Construction
Post-Bid
Highlands Ranch, CO 80129

Grandview Pump Station Phase I: Building Improvements and/or Phase 2 and Site Improvements Projects
Renovation
Results
Durango, CO 81301

Lift Station Pump Replacement
Results
Denver, CO 80202

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Binney Connection Project Treatment and Pumping Package
New Construction
Post-Bid
$19,000,000 est. value
Aurora, CO 80010

Smoky Hill Pump Station Improvements
Results
$3,200,000 to $3,670,000 est. value
Aurora, CO 80012

Lift Station A And Force Main Project
Post-Bid
Northglenn, CO 80241

Gun Club Road Pump Station Major Improvements Project
Results
$5,000,000 to $5,400,000 est. value
Aurora, CO

The Lakes at Centerra Metropolitan District Lakes Phase 7 Non-Potable Pump House
Post-Bid
Loveland, CO 80537

Ridgegate First Street Lift Station
Results
Lone Tree, CO

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Oak Grove Elementary School Christmas Break Sewage Lift Station Upgrade Project
Results
Montrose, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

Reported 05/30/2020 12:00 AM
Project Title

Chambers Reservoir Remediation Project Phase II

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO 80111   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This portion of the Phase II Chambers Reservoir Remediation Project (Project) consists of providing sanitary facilities, trash service and trailer office space for General Contractor and Liner Contractor. Furnishing and installing the underdrain system include slotted drains, geotextile, filter media, fittings and piping. Furnishing and installing reinforced concrete for the Speece cone pad, Spillway modifications and access road. Furnishing and installing the piezometer vaults. Reinstalling the Speece cone oxygenation system including connections to the pump station. Completing all subgrade and foundation preparation, finish grading and maintaining the grading in an acceptable condition for liner installation. Completing anchor trenching and maintenance of the anchor trench in an acceptable condition for liner installation. Furnishing and installing articulated concrete block system. Furnishing and installing final gravel road material. Dewatering the site for installation of underdrain system and liner installation. Obtain Grading, Erosion and Sediment control permit, access permit, air quality permit and dewatering permit. The Liner Installation construction work will be bid separately and will be completed others. General contractor, under this contract, will be responsible for the management and scheduling of all work on site including coordination and scheduling work with the Liner Contractor.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents